A current transformer (CT) produces a small secondary current, normally 1 A or 5 A, in proportion to the current in the primary conductor, so meters and protection relays can measure it safely. Select a CT by its ratio, its accuracy class (metering or protection), its rated burden in VA and its construction; a core balance CT (CBCT) encircles all the phase conductors to detect earth-fault current. CTs are specified with the switchgear and distribution transformers they serve, and bought from current transformer suppliers in the UAE.
This explainer is for electrical designers, panel builders, protection engineers and buyers specifying CTs for LV and MV switchboards, ring main units and substations. It covers how a CT works, the ratio, metering and protection classes, burden, CBCTs for earth fault, construction types, safety and an ordering checklist. It sits in our series on transformers in the UAE and Saudi Arabia, which covers power and distribution transformers. ListGCC has not tested any CT; the facts below come from IEC, the Saudi Electricity Company and maker sources listed at the end.
How a current transformer works
A CT is a series-connected measuring transformer: the primary is the conductor carrying the load current (often a single busbar or cable passing through the core), and the secondary winding delivers a current proportional to it. The standard for new inductive CTs is IEC 61869-2:2012, which covers CTs for measuring instruments and protective devices at 15 Hz to 100 Hz, is read together with IEC 61869-1, and replaced the older IEC 60044-1 and IEC 60044-6. North American projects use IEEE C57.13 instead, with a different rating notation.
Two rules follow from how a CT works:
Never open the secondary while the primary carries current. The CT keeps trying to drive its current into what has become an infinite impedance, and the secondary voltage can reach dangerous levels, several kilovolts on some CTs, enough to cause arcing and destroy the insulation. Short the secondary terminals of any CT that is not connected to a burden.
Earth the secondary at one point only. SEC's specification for MV automatic transfer switches, for example, requires the secondary windings of each CT to be grounded at one point only.
A current transformer nameplate: rated ratio 15/5 A, accuracy class 0.5 at 5 VA, insulation level 12/28/75 kV and short-time thermal current, made to IEC 60044-1 (since replaced by IEC 61869-2). Photo: SAM31416, CC BY-SA 4.0, via Wikimedia Commons
CT ratio: primary and secondary current
The ratio is written primary/secondary, for example 1,000/5 A: 1,000 A in the primary gives 5 A in the secondary. Rated secondary current is normally 5 A or 1 A.
Primary rating. Choose a standard primary current at or just above the circuit's maximum load current, so normal load sits in the CT's accurate range. A 1,500 kVA transformer at 400 V delivers about 2,165 A at full load, so its LV incomer CTs need a primary rating above that, for example 2,500 A.
1 A or 5 A secondary. Lead loss rises with the square of current, so for the same lead resistance a 1 A secondary loses 25 times less power in its wiring than a 5 A one. That favours 1 A where the secondary leads are long. Match the relay or meter input.
Short-time ratings. The CT must survive the circuit's fault current. SEC's ATS specification requires the mechanical and thermal ratings of CTs to be coordinated with the momentary and short-circuit current of the associated breaker; the nameplate above, for example, states a 1 s thermal current and a dynamic current.
Accuracy classes: metering vs protection
A CT is designed either to be accurate at normal load (metering) or to stay accurate up to many times rated current during a fault (protection). The two needs pull in opposite directions, so specify separate cores or separate CTs for each.
Metering CT
Protection CT
Accuracy needed
At normal load, up to 120% of rated current
Up to a multiple of rated current during faults
IEC class examples
0.1, 0.2, 0.2S, 0.5, 0.5S, 1, 3
5P or 10P followed by the accuracy limit factor, for example 5P20
What the number means
Maximum ratio error in percent at rated current and rated burden
5 or 10 is the error limit in percent; the factor after P is the multiple of rated current up to which it holds
Core design
Smaller core that saturates at lower secondary voltage, protecting the meter during faults
Larger core and higher VA so it does not saturate during the fault
Feeds
Energy meters, ammeters, power monitors
Overcurrent, earth-fault, differential and distance relays
Metering classes. The class number is the maximum ratio error in percent at rated primary current and rated burden. A class 0.2 CT, for example, must stay within 0.75% at 5% of rated current, 0.35% at 20%, and 0.2% at 100% and 120%, with phase displacement limits as well. Revenue metering on a utility connection is specified by the utility, and SEC's ATS specification states that CT accuracy class is set in its technical data schedule.
Protection classes. Protection CTs carry the letter P. The standard classes are 5P and 10P, and the number after the P is the accuracy limit factor, with standard values from 5 to 30. A 5P20 CT, for example, stays within 1% ratio error at rated current and within 5% error at 20 times rated current, at its rated burden. Protection CTs see fault currents of 20 to 30 times rated current, which is why the factor matters. For some protection schemes the CT is specified by its knee-point voltage instead: the secondary voltage at which a 10% increase in applied voltage raises the magnetising current by 50%.
Burden: matching the CT to the meter or relay
The burden is the load on the CT secondary: the input of every meter or relay in the circuit plus the resistance of the connecting leads, stated in VA at rated secondary current. A CT keeps its stated accuracy only up to its rated burden.
Add the VA of all devices on the secondary, from their data sheets.
Add the lead burden: lead resistance (out and back) times the square of the secondary current.
Choose a rated output above the total. For metering CTs, accuracy is specified between 25% and 100% of rated burden, so a CT with a rated burden far above the real one can read outside its class.
Protection CTs are rated only at their rated burden, so check that the total stays at or below it, or the CT may saturate early during a fault.
Core balance CTs for earth-fault protection
A core balance CT, also called a zero-sequence or residual current CT, is a ring-type CT through which all three phase conductors (and the neutral on a four-wire LV circuit) pass together. In a healthy circuit the currents cancel, and only the net unbalanced current, the current leaking to earth, produces a secondary current. That suits it to sensitive earth-fault protection. Typical uses include:
Sensitive earth-fault protection on MV cable feeders and ring main unit tee-offs
Earth-fault protection of large motors
Earth leakage relays on LV feeders, the same principle as the summation transformer inside a residual current device
Good results depend on installation. Pass all live conductors through the window together, centre the cables, and follow the relay maker's instructions for routing cable screens and earth conductors relative to the CBCT. Check that the relay maker approves the CBCT ratio and window size for its relay.
Window (ring) CTs: a ring core with the secondary wound on it; the busbar or cable passes through. Common in LV and MV switchgear. SEC's ATS specification calls for bus bar primary or window type CTs and does not accept looping feeder cables or secondary conductors through the window.
Outdoor HV CTs: free-standing units in substations, oil-paper or SF6 insulated. Hitachi Energy, for example, lists current transformers, inductive and capacitive voltage transformers and combined units from 25 kV to 800 kV, in oil-filled and SF6 gas-insulated designs, for revenue metering and protective relaying.
Voltage transformers (VTs) are the companion device for voltage measurement; browse voltage transformer suppliers alongside CTs.
UAE and Saudi points to check
Utility metering: CTs for the utility's revenue meter at the point of supply are specified by the utility (DEWA, ADDC, AADC, SEWA or SEC). Confirm who supplies them before ordering them with the switchboard.
SEC prequalification: SEC's ATS specification states that instrument transformers must follow SEC's standard prequalification process, and it cites IEC 61869-1 and IEC 61869-2.
Panel ratings: CT short-time ratings must match the switchboard's fault level; at the LV side of a large transformer that fault level can be tens of kA. The kVA sizing guide shows the estimate.
What is a core balance current transformer used for?
A core balance CT detects earth-fault current. All the phase conductors of a circuit pass through its ring together, so in normal service their currents cancel and the CT output is zero. When current leaks to earth, the imbalance produces a secondary current that operates an earth-fault or earth-leakage relay. It is used on MV feeders, ring main unit tee-offs, motors and LV feeders.
What does 5P20 mean on a current transformer?
It is an IEC protection class. P means protection, 5 is the error limit in percent, and 20 is the accuracy limit factor. A 5P20 CT stays within 5% error up to 20 times its rated primary current at its rated burden, and within 1% ratio error at rated current, so the relay still sees the fault current accurately during a fault.
What is the difference between a metering CT and a protection CT?
A metering CT is accurate at normal load currents, up to 120% of rated current, and is designed to saturate during faults so it does not damage the meter. A protection CT must stay accurate up to many times rated current so relays measure faults correctly. They use different classes, for example 0.5 for metering and 5P20 for protection, and usually separate cores.
Should I choose a 1 A or a 5 A CT secondary?
Match the relay or meter input first. Where the choice is open, 1 A suits long secondary leads, because lead loss rises with the square of current: for the same lead resistance a 1 A secondary loses 25 times less power than a 5 A one, leaving more of the CT's rated burden for the devices.
Why must a CT secondary never be open-circuited?
Because the CT keeps trying to drive its secondary current, and with the circuit open it develops a very high voltage instead, several kilovolts on some CTs. That can cause arcing, damage the CT insulation and endanger anyone working on the wiring. Always short the secondary terminals before disconnecting a meter or relay, and short any CT that has no burden connected.
What is CT burden?
Burden is the total load connected to the CT secondary: the input of every meter or relay plus the resistance of the leads, stated in VA at rated secondary current. The CT holds its accuracy class only up to its rated burden. For metering CTs accuracy is defined between 25% and 100% of rated burden, so choose a rating close to, and above, the real total.
A buyer's guide to transformers in the UAE and Saudi Arabia: types, data sheet ratings, IEC 60076, DEWA and SEC specifications, losses, Gulf heat derating, makers and what to put in an RFQ.
A practical guide to transformer testing: factory routine and type tests, FAT and SAT, oil breakdown voltage, water and acidity, DGA interpretation, thermography and Gulf maintenance points.
Size a transformer in kVA: formulas, load schedule, demand and diversity, power factor, harmonics, motor starting, Gulf heat derating to SEC practice, standard ratings and LV fault level.