How to Size a Transformer in kVA
Size a transformer in kVA: formulas, load schedule, demand and diversity, power factor, harmonics, motor starting, Gulf heat derating to SEC practice, standard ratings and LV fault level.

Size a transformer in kVA: formulas, load schedule, demand and diversity, power factor, harmonics, motor starting, Gulf heat derating to SEC practice, standard ratings and LV fault level.

To size a transformer in kVA, list every load in kW, apply demand and diversity factors to get the maximum demand, divide by the expected power factor to convert kW to kVA, add an agreed allowance for future load, then check the result against the site ambient and choose the next standard rating, such as 1,000 or 1,500 kVA. Take the finished data sheet to distribution transformer suppliers in the UAE and ask each to confirm the rating at your site conditions.
This how-to is for electrical design engineers, MEP contractors and facility teams sizing a new MV/LV transformer or checking an existing one before adding load. It covers the formulas, the load schedule, diversity, power factor, harmonics, motor starting, heat derating at Gulf ambients and fault level, with a worked example. For transformer types, standards, utility rules and makers, read the main guide to transformers in the UAE and Saudi Arabia. Utility and consultant rules on demand calculation take precedence over anything here.
For a three-phase transformer:
A transformer is rated in kVA, not kW, because its heating depends on current, and current depends on apparent power whatever the power factor of the load.
Start from a load schedule that lists every load group with its connected kW and its power factor. Typical groups for a commercial or residential building in the Gulf are:
Use nameplate or design figures, not guesses, and record which loads are on essential (generator-backed) supply, because that also sizes the standby generator.
Not every load runs at full power at the same time. A demand factor scales a load group to the share that runs at peak (for example, not all small-power sockets are loaded). Diversity reflects that groups peak at different times (lighting and cooling, offices and apartments). The maximum demand is the sum of each group's connected load times its demand factor, divided by the diversity between groups.
Which factors to use is not a free choice. Use the method required by the connecting utility (DEWA, ADDC, AADC or SEWA in the UAE; SEC in Saudi Arabia) and, on private plants, the owner's standard. If the utility gives no figures, document the factors the consultant applies so the reviewer can check them. Factors that are too generous give an undersized transformer that overheats in July; factors that are too cautious give an oversized one that runs lightly loaded all year with its no-load losses still drawn around the clock.
Divide maximum demand in kW by the expected power factor at the transformer. Motor-heavy loads (chillers, pumps, compressors) lower the power factor; resistive loads raise it. Low power factor increases current for the same useful power, so it needs larger transformers, cables and switchgear, and utilities in many countries charge customers whose power factor falls below about 0.9 to 0.95.
Power factor correction capacitors near the loads reduce the kVA the transformer has to supply. If the design includes automatic power factor correction or capacitor banks, size the transformer on the corrected power factor, but only if the correction will be in service at peak. Capacitors can cause resonance with harmonic loads, so they need engineering analysis, not just a kVAr figure.
Harmonics. Non-linear loads (variable speed drives, UPS rectifiers, LED drivers, IT power supplies) distort the current waveform. The distortion lowers the true power factor and adds heating in the transformer beyond what the kW figure suggests. Where non-linear loads are a large share of the total, ask the maker for a transformer designed for the harmonic spectrum (the K-factor is a measure of how well a transformer withstands harmonic loads) and have the harmonics studied, rather than simply adding kVA.
Motor starting. When a motor is energised it draws a current close to its stalled current, falling as it speeds up. A large direct-on-line start causes a voltage dip that depends partly on the transformer's impedance. Check the largest motor start against the voltage dip the other loads can tolerate, and use soft starters, star-delta or drives where needed. Energising the transformer itself also draws a magnetising inrush that can reach 10 to 15 times rated current for a few cycles, which the MV protection settings must ride through.
Add an allowance for load that will come later: tenant fit-outs, extra cooling, EV chargers, process expansion. There is no universal percentage; the client, consultant or utility sets it, and it should be written into the design basis. Remember that replacing a transformer in a built substation later is far more disruptive than buying one size up now, but that every oversized unit keeps drawing its no-load losses.
This is where Gulf sizing differs most. Transformer ratings assume IEC normal service conditions: ambient air up to 40 °C, a hottest-month average up to 30 °C and a yearly average up to 20 °C for air-cooled transformers, below 1,000 m. Dubai's mean daily maximum is about 41.7 °C in July and Riyadh's about 43.6 °C in August, with records near 49 °C and 49.8 °C. A transformer specified only to IEC normal conditions has less capacity in a Gulf summer than its nameplate states.

Two approaches work:
SEC's emergency loading table shows how much heat matters: after running at 75% load, a unit must carry 133% load for 240 minutes at 30 °C ambient but for only 155 minutes at 40 °C, and 150% for 98 minutes at 30 °C against 65 minutes at 40 °C. For dry-type units in rooms, the room temperature is the ambient; SEC rates its cast resin units for natural air cooling up to 50 °C and requires a design that accepts fans for 25% more capacity. Treat fan cooling as overload margin, not base rating.

Round up to a standard rating the utility or maker offers. SEC's standard ratings are 100, 200 and 300 kVA pole-mounted and 300, 500, 1,000 and 1,500 kVA pad-mounted; DEWA's network purchases have been 1,000 and 1,500 kVA units at 11/0.4 kV. For larger loads, use two or more transformers rather than one very large unit; this also allows one to be taken out for maintenance if the others can carry the essential load.
Then check the LV fault level, because a larger transformer can deliver more fault current into the main switchboard. As a first approximation, with an infinitely strong MV source, the LV fault current is the rated current divided by the per-unit impedance voltage. A 1,500 kVA unit at 400 V with 6% impedance (SEC's value above 500 kVA) gives about 2,165 / 0.06, or roughly 36 kA, before cable and source impedance reduce it. The LV switchgear and breakers must be rated for it; the cable sizing guide covers the cables.
The figures below are assumptions for a mid-size commercial building, to show the method. They are not design values; use your utility's factors and your own load data.
| Load group | Connected kW | Assumed demand factor | Demand kW |
|---|---|---|---|
| Chillers and HVAC | 900 | 0.85 | 765 |
| Lighting | 150 | 0.9 | 135 |
| Small power | 300 | 0.5 | 150 |
| Lifts | 120 | 0.6 | 72 |
| Pumps | 110 | 0.7 | 77 |
| Total | 1,580 | 1,199 |
Send the result to bidders as a data sheet, not just a kVA figure: rated kVA, voltages, vector group, impedance, cooling, site ambient (maximum, monthly and yearly average), room conditions, harmonic content, largest motor, losses required and the governing utility specification. Makers publish wide ranges: Emirates Transformer & Switchgear lists distribution transformers from 50 kVA to 5 MVA, and Siemens Energy from 10 kVA to 10 MVA, so the data sheet, not the catalogue, decides the unit. For Saudi projects, compare distribution transformer suppliers in Saudi Arabia against the SEC specification. Install energy meters and monitoring on the LV side so you can check the real maximum demand against the design after the first summer.
More in this series: Oil-Immersed vs Dry-Type Transformers, Current Transformers and Core Balance CTs and Transformer Testing and Maintenance.
Add the connected kW of each load group, multiply each by its demand factor, divide by the diversity between groups, then divide by the expected power factor to get kVA. Add the agreed growth allowance and round up to the next standard rating. Finally, confirm with the maker that the rating holds at your site ambient. Use the utility's factors where it publishes them.
For a three-phase transformer, full-load current in amps equals kVA x 1,000 divided by (1.732 x line voltage). At 400 V, 1,000 kVA gives about 1,443 A and 1,500 kVA about 2,165 A. That current sizes the LV main breaker, busbars and cables, and with the impedance it sets the LV fault level.
There is no single rule. The client, consultant or utility sets a growth allowance in the design basis, based on planned fit-outs, cooling additions, EV chargers or process expansion. Balance it against losses: an oversized transformer keeps drawing its no-load losses whatever the load, so spare capacity has a running cost as well as a purchase cost.
Yes, unless it was designed for that ambient. IEC normal service conditions assume ambient air up to 40 °C with a hottest-month average of 30 °C and a yearly average of 20 °C. Above that, the continuous rating falls. Either specify the rating at the site ambient, as SEC does with its 55 °C guarantee, or ask the maker for the derated rating to IEC 60076-7 or IEC 60076-12.
Because its heating depends on the current it carries, and current depends on apparent power (kVA), not only on real power (kW). A load with a low power factor draws more current for the same kW. The transformer cannot know the load's power factor, so it is rated for the kVA it can deliver.
Two or more units give redundancy and allow maintenance without a full shutdown, provided the remaining units can carry the essential load. They also keep the LV fault level per switchboard lower. One unit is simpler and needs less room. The choice depends on how critical the load is, the substation space and the utility's standard ratings.
Featured image: Photo: Rept0n1x, CC BY-SA 3.0, via Wikimedia Commons
Looking for a supplier?
Post your requirement once and receive quotes from verified suppliers. Free for buyers, with no obligation.

A buyer's guide to transformers in the UAE and Saudi Arabia: types, data sheet ratings, IEC 60076, DEWA and SEC specifications, losses, Gulf heat derating, makers and what to put in an RFQ.

A practical guide to transformer testing: factory routine and type tests, FAT and SAT, oil breakdown voltage, water and acidity, DGA interpretation, thermography and Gulf maintenance points.

How step-up and step-down transformers differ, where each is used at Gulf power plants, solar sites and buildings, and what isolation, auto, K-rated, earthing and instrument transformers do.