Water tanks and reservoirs in the UAE store treated water from a villa roof tank to DEWA utility reservoirs of 120 million imperial gallons. This page compares concrete, steel, GRP and polyethylene storage, explains Abu Dhabi ground and roof tank rules, heat and hygiene design, the approvals that apply, and what drives price and lead time.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified water tanks & reservoirs suppliers who quote for your order directly.
Tell us about water tanks & reservoirs in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
How one-component and two-component polyurethane, PU/polyurea hybrids and hot-spray pure polyurea differ, where each suits Gulf roofs, decks, wet areas and tanks, and what the data sheets and approvals should show.
Rigid or flexible cementitious waterproofing, where each works (wet areas, tanks, pools, basements from the inside), how thick to apply it, how to cure it in Gulf heat and what to ask suppliers for.
Size a building booster pump set step by step: head from the highest outlet, peak flow from loading units, pressure zones for towers, duty and standby pumps, vessel precharge, noise and the plant room.
Water tanks and reservoirs hold treated water so that supply, demand and pressure stay balanced, from a 1,000 litre roof tank on a villa to a 120 million imperial gallon utility reservoir. In the UAE they sit within water infrastructure in the UAE and are bought by utilities, developers, building owners, industrial plants and farms.
This page is about storage strategy across scales and materials. For one product in depth see GRP tanks and vessels, plastic tanks and containers and tank fabrication.
| Type | Typical UAE use | Specify |
|---|---|---|
| Concrete reservoir | Utility storage of desalinated water, strategic reserves | Waterproofing, joints, roof, mixing and chlorine control, inlet and outlet arrangement |
| Steel tank (welded or bolted) | Industrial and fire water, utility storage where steel is chosen | Coating system, cathodic protection, roof and vent, foundation |
| GRP sectional tank | Ground and roof tanks in buildings, treated water, fire water | Panel thickness, internal baffling, access, food contact approval |
| Polyethylene tank | Villas, small buildings, farms, chemical day tanks | Capacity, UV stabilised outer layer, light blocking, fittings |
| Underground and aquifer storage | Strategic reserve, seasonal storage | Hydrogeology, recovery rate, water quality control |
DEWA commissioned the Enkhali reservoir with a capacity of 120 million imperial gallons at a cost of AED 287.8 million. It reports that Dubai's desalinated water storage stood at 1,001.3 million imperial gallons, and that the Enkhali, Lusaily, Hassyan and Hatta reservoirs together will bring it to 1,121.3 million. DEWA also describes an aquifer storage and recovery project, planned to store up to 6,000 million imperial gallons when complete. The reservoirs support the UAE Water Security Strategy 2036.
At building scale, Abu Dhabi rules set when tanks are required. The Department of Energy's Water Supply Regulations 2024 say that in high-rise buildings ground storage tanks and roof tanks are considered under the Guide's capacity criteria. For new low-rise buildings, ground tanks should not be considered if adequate network pressure and supply conditions are available, and they are mandated if direct supply to roof tanks cannot be guaranteed. Confirm the current rule with the distribution company before sizing.
Choose the material from the water type, the location and the maintenance plan, then size for the actual demand pattern rather than a headline volume.
Roof tanks sit in direct summer sun, and warm stored water encourages biofilm and algae. Light blocking walls, a covered and screened vent, shading and insulation help. Polyethylene tanks should use a UV stabilised outer layer, and the inside should block light, which the Saudi draft tank standard also stresses. Metal roof tanks need good ventilation to stop condensation.
The Abu Dhabi regulation requires the responsible person to inspect ground and roof tanks regularly and clean them when necessary following the Guide, so the water does not become contaminated inside the customer's fittings. It also requires a float operated valve or equivalent on tank inlets with an air gap overflow to prevent backflow. Plan manways, drain points and a split or twin tank so one half can be cleaned while the other supplies the building.
Ground tanks on reclaimed or coastal land need a proper foundation survey. Steel tanks near the coast need durable coating and regular inspection of internal and external surfaces, and concrete reservoirs depend on joint sealing and waterproofing, see crystalline waterproofing and cementitious waterproofing.
Tanks for potable water must keep the water wholesome, so materials and linings are checked for drinking water contact and the installation follows the distribution company rules. Check the specific emirate requirement with the authority, as of 2026.
| Requirement | Applies to | Who sets it |
|---|---|---|
| Water Supply Regulations 2024, clauses 3.3.5, 3.6.3 and 3.9 | Float valve and air gap, inspection and cleaning, ground and roof tank provision | Abu Dhabi Department of Energy |
| Water Quality Regulations 2021, fifth edition | Quality of water exiting the distribution system, with sampling programmes for storage tanks, reservoirs and tankers | Abu Dhabi Department of Energy |
| Utility reservoir specification | Concrete and steel reservoirs on public networks | DEWA and other utilities |
| Material and product approvals for potable contact | Tank materials, linings and coatings | Local utility or municipality, ask for the current list |
| ECAS and EQM conformity | Regulated products where applicable | MoIAT, see our ECAS and EQM guide |
The Water Quality Regulations 2021 also include a sampling table for water storage tanks and reservoirs, and say tankers with internally painted coatings must test for total organic compounds, a reminder that coating selection is a quality question as well as a durability one.
For large reservoirs, appoint a contractor with a track record on utility projects and review the waterproofing and mixing design. For building tanks, buy from the manufacturer or an authorised distributor who can supply a drinking water contact certificate, drawings for roof loads and a delivery and installation plan. Ask about local service for repairs and cleaning.
Storage connects with the rest of the network: see water pumping stations for filling and boosting, water pipeline materials for inlet and outlet pipes, and water meters for metering. To compare UAE suppliers, post your requirement with capacity, material and site.
Start from the daily demand of the building and the reliability of the supply, then split storage into at least two cells so one can be cleaned while the other serves. Place the inlet and outlet at opposite ends to avoid dead zones where water stagnates, and give each cell its own isolation valve, level sensor and low level cut-out for the pumps. Where the network pressure is adequate and the rules allow, a direct supply may remove the need for a ground tank, as the Abu Dhabi regulation recognises.
Detailing matters as much as volume. Keep the overflow with an air gap and screened, vent the tank through an insect and dust screen, and fit a sloped floor to a sump. After construction, repair or cleaning, disinfect and flush the tank before use, and keep a written cleaning log for the facility manager and the inspector. GRP and steel tanks need a flat, level foundation, and polyethylene tanks need a full base because partial support can crack the wall. Concrete tanks need joint detailing, early curing in hot weather and waterproofing where the water contacts the structure.
Capacity, material, access and foundation works set the price. Polyethylene tanks are widely available from stock, while large GRP, steel or bolted tanks are made to order and need a site survey. Concrete reservoirs follow civil programmes measured in months or years, with waterproofing, testing and disinfection at the end. Crane access, hot weather concreting and approvals from the utility can all extend the schedule.