Crude oil storage tanks in the UAE are large, welded steel tanks (and a smaller number of rock caverns) that hold crude at Abu Dhabi fields, refineries and the Fujairah export hub. Most are floating roof tanks built to API 650 and inspected to API 653. This page covers tank types, Gulf conditions, standards, suppliers and what moves price and delivery.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified crude oil storage tanks suppliers who quote for your order directly.
Tell us about crude oil storage tanks in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
A crude oil storage tank is a vertical, flat bottomed, welded steel vessel that holds crude at close to atmospheric pressure until it is pumped to a refinery, a pipeline or a tanker. They sit inside the wider range of storage tanks and terminals in the UAE, and they are the biggest single items on any terminal plot plan. If you are looking for the fabrication side of steel tank building, the companion page on tank fabrication in the UAE covers shop and field welding, and this page stays with crude service.
The roof is what separates one crude tank from another, because it decides how much vapour escapes and how much fire risk sits on the surface of the oil.
| Tank type | Where it fits in UAE crude handling | Points to specify |
|---|---|---|
| External floating roof | Large export and field tanks where the oil is stable enough for a roof that rides on the surface | Primary and secondary rim seals, roof drains, rolling ladder, roof legs, wind girder |
| Internal floating roof under a fixed roof | Tanks that must keep rain and blown sand off the floating deck | Deck type, peripheral seal, vents in the fixed roof, access hatches |
| Fixed cone or dome roof | Smaller slop, surge and intermediate tanks, often with a vapour recovery or blanketing line | Pressure and vacuum vents, emergency venting, flame arresters where required |
| Underground rock cavern | Strategic or very large volume storage, as in the cavern project ADNOC planned at Fujairah | Geology, water curtain, access shafts, a topside pumping and measurement station |
Roof choice is a process decision, so ask the process engineer for true vapour pressure and for the range of crudes before asking suppliers for a quote.
The centre of gravity is Fujairah, the east coast hub outside the Strait of Hormuz. A 2021 industry report quoting Platts said crude storage there was expected to approach 10 million cubic metres once the main additions finished, with ADNOC building underground caverns planned at 42 million barrels (6.72 million cubic metres), and terminal operators such as Brooge and Ecomar adding tanks. The report gave 2022 as the expected completion year for the caverns and its current status is unconfirmed, so check with ADNOC before relying on it. Further inland, producing fields, Ruwais and the other Abu Dhabi processing sites hold crude in their own tank farms.
Large tanks are built on site by EPC and tank contractors, not delivered whole. A supplier sells you a design, plate, welding and erection labour, a hydrotest and a handover package. Items bought separately for the same tank include rim seals, roof drains, mixers, radar level transmitters, and pipeline valves for the manifold. The plant around the tank, such as booster pumps, sits in the neighbouring compression and pumping stations category. Refrigerated gas follows a different route, covered on LNG storage systems.
Summer shell temperatures in the UAE climb well above ambient in direct sun, and the daily swing makes the oil and vapour space breathe heavily. On fixed roof tanks that means more working through the vents; on floating roof tanks it means the roof moves less but the seals see more thermal stress. Specifications for Abu Dhabi and Fujairah tanks usually address four site effects.
These are engineering practice points rather than rules; the project specification decides which apply.
As of 2026, there is no UAE product certificate for a welded steel storage tank. Owners write international codes into the contract and then check compliance during construction and in service. The usual set is below.
| Standard or requirement | What it covers | Who applies it |
|---|---|---|
| API 650, thirteenth edition | Welded tanks for oil storage: shell, floor and roof design, materials, fabrication and testing | Owners, EPC contractors and inspection bodies |
| API 653 | Inspection, repair, alteration and reconstruction of tanks already in service | Terminal and field operators |
| API 2350, fifth edition | Overfill prevention for storage tanks in petroleum facilities | Terminal operators, safety engineers |
| Owner engineering specifications | Materials, coatings, tank accessories, approved vendor lists | ADNOC group companies and large terminal operators |
| ECAS-Ex certification | Electrical and instrument equipment fitted in hazardous areas around tanks | Suppliers of gauges, motors, lighting |
| In-Country Value (ICV) certificate | Tender scoring for many UAE buyers | Ministry of Industry and Advanced Technology |
API says its 650 standard exists to support the safety, sustainability and environmental performance of oil storage tanks, and the 2350 edition puts more weight on how fast operators respond to high level alarms. Our guide to ECAS and EQM product conformity in the UAE explains how the conformity scheme treats instruments and electrical items on a tank, and the civil defence approval guide covers foam and fire protection.
Choose on delivered quality evidence, not on a catalogue price per cubic metre. For a project tank, shortlist tank contractors with API 650 field erection references in the Gulf, welder qualification records, and a quality plan that includes vacuum box testing of floor welds, radiography of shell butt welds and a full hydrotest. For accessories, the manufacturer or its authorised UAE agent is the safer route; a stockist is fine for gauge glasses, gaskets and small fittings but not for rim seals or roof drain systems that need engineering data.
The Endress+Hauser Micropilot NMR81 is one example: the maker lists it for custody transfer and inventory control with OIML R85 and API 3.1B conformity, and its electronics are developed to IEC 61508 up to SIL3 in a redundant arrangement. Confirm current certificates on the maker's documents.
Price follows steel weight first, then labour days on site. Lead time follows plate and fittings supply, mobilisation, foundation readiness and the hydrotest window.
For comparison quotes from several UAE tank contractors, post your requirement with the datasheet and plot plan attached.