Solar mounting systems in Saudi Arabia are the rooftop racks, carport frames and fixed-tilt ground structures that support PV modules on factories, farms, car parks and utility plants. This page lists Saudi suppliers of solar mounting structures and explains the system types, design for sand, wind and coastal corrosion, the IEC design standards in SASO's PV regulation, UL 2703 listings, local fabrication and what drives price and lead time.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified solar mounting systems suppliers who quote for your order directly.
Tell us about solar mounting systems in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
A step-by-step method to size rooftop solar in the UAE and Saudi Arabia from your bills, with modelled yields for five cities, roof area per kWp, DEWA and SEC caps and air conditioning examples.
A buyer guide to rooftop solar in the UAE and Saudi Arabia: yields by city, module types, DEWA, Abu Dhabi and SEC connection rules, dated cost figures, brands, warranties and an RFQ list.
Why solar panels in the UAE and Saudi Arabia produce less than their rating in summer and after dust storms, how to compare modules on heat, and how to plan cleaning and warranties.
Solar mounting systems are the structural frames, rails, clamps and foundations that fix PV modules to a roof, a carport or the ground at a set tilt and orientation. In Saudi Arabia they are bought for industrial roofs in Riyadh's 2nd Industrial City, Jeddah and the Eastern Province, for farm plants in Qassim and Al Jouf, and for utility fields under the National Renewable Energy Program. They form one part of solar energy equipment for Saudi projects, which covers the SASO and grid connection framework for the whole system.
| Structure | Saudi application | Points to specify |
|---|---|---|
| Rail and clamp kit for metal roofs | Warehouses and factories with trapezoidal or standing seam sheeting | Clamp matched to sheet profile, fixing into purlins, sealing, rail expansion joints |
| Ballasted or anchored flat-roof frame | Concrete roofs on offices, schools, hospitals and homes | Roof load capacity, ballast layout by wind zone, waterproofing at anchors |
| Solar carport | Car parks at universities, malls, hospitals and government buildings | Steel frame and foundation design, clear height, drainage, lighting |
| Fixed-tilt ground table on piles | Farm, industrial and utility plants on sand or gravel | Pile type (driven, screw or concrete), geotechnical tests, row spacing, cleaning access |
| Fixed-tilt ground table on concrete | Rocky ground or sites where piles cannot be driven | Footing size, excavation, sulphate-resistant concrete where soils require it |
Large Saudi plants increasingly use single-axis trackers instead of fixed tables; SASO lists IEC 62817 for tracker design qualification. Whatever the structure, it has to match the frame and clamping zones of the solar modules, and the layout decides where PV inverters can be shaded.
Saudi sites test structures in three ways: wind and sandstorms load them, loose or rocky ground complicates foundations, and coastal humidity corrodes them. The right design depends on which of these dominate at the site.
Shamal winds and sandstorms put repeated uplift on module rows, and roof edges and corners see the highest pressures. Structural design in the Kingdom follows the Saudi Building Code, whose loads part (SBC 301) draws on ASCE 7; ASCE 7-16 added rooftop solar provisions in sections 29.4.3 and 29.4.4. Confirm the current SBC edition and how the engineer of record applies it to the array, and ask suppliers for project-specific calculations rather than generic span tables.
Ground-mount plants need pull-out and lateral load tests on the piles before the design is frozen. Loose sand may need longer piles or screw piles; rock may need pre-drilling or concrete footings. On difficult ground, ground anchors are another option. The SASO regulation also lists IEC TS 62738, the design guideline for ground-mounted PV plants, which the plant designer should follow alongside the geotechnical report.
Jeddah, Rabigh, Yanbu, Jubail, Dammam and Al Khobar sites see humid, salty air, and industrial zones add chemical exposure. Specify hot-dip galvanising after fabrication or zinc-magnesium coated steel made for PV mounting, aluminium with stainless fixings, and isolation between dissimilar metals. Ask what corrosion environment the coating warranty assumes.
IEA PVPS research shows soiling hits utility plants in arid regions hardest. Set row height and spacing so sand does not bank against the low edge and cleaning machines or robots can run along the rows. Interior plants with scarce water often choose dry-cleaning robots, which need a straight, continuous table edge.
As of 2026, SASO's Technical Regulation for Solar Photovoltaic Systems lists the array and plant design standards that frame mounting design, while the structure itself is approved as part of the building or plant design under the Saudi Building Code.
| Standard or rule | Scope | Who applies it |
|---|---|---|
| SASO IEC 62548 | PV array design requirements | Designer, listed in the SASO PV regulation |
| IEC TS 62738 | Ground-mounted PV plants: design guidelines and recommendations | Plant designer and owner's engineer |
| SASO IEC 62817 | Design qualification of solar trackers | Tracker supplier and certification body |
| Saudi Building Code (loads part SBC 301) | Structural loads including wind on buildings and structures | Engineer of record, municipality |
| UL 2703 | Mounting systems and clamps for PV modules: bonding, fire class, load rating | Certification bodies such as Intertek and UL |
What UL 2703 gives the installer. A listed racking system has a mechanical load rating, a system fire class of A, B or C where fire tested, and installation instructions that name the evaluated modules, allowable spans and cantilevers, and torque values. Ask for these documents even where the listing is not mandatory.
Electrical parts. Mounting steel is not a SASO-certified PV product in its own right, but cables, combiner boxes and protection devices mounted on it are; see our guide to SASO and SABER certificates.
Saudi projects buy mounting structures either as imported engineered kits or as locally fabricated steel. On NREP utility projects local content counts: Round Two set a 17 percent minimum calculated under LCGPA rules, and structures are one of the components that can be made in the Kingdom from local structural steel and galvanised locally. Rooftop kits for metal and concrete roofs are mostly imported and held by distributors in Riyadh, Jeddah and Dammam.
Ask suppliers for signed calculations, pile test procedures for ground mounts, the coating specification and warranty, compatible module lists, torque values and references on similar sites. Most owners buy structures through a qualified solar EPC contractor in Saudi Arabia; to approach fabricators and kit suppliers directly, post your mounting structure requirement, and see our article on vetting industrial suppliers.
Steel prices, foundation conditions and local fabrication capacity matter most.