Ground anchors in Saudi Arabia are stressed, grouted strand or bar tendons that support deep excavations in Riyadh and Jeddah, hold structures down against groundwater uplift in the Eastern Province and stabilise rock slopes on highways in the southwest. This page lists Saudi anchor suppliers and installers and covers anchor types, soil and rock conditions, design and testing standards, and what sets cost and delivery.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified ground anchors suppliers who quote for your order directly.
Tell us about ground anchors in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Ground anchors transfer a tension force from a structure into soil or rock through a tendon that is free over its outer length and grouted over its inner bond length, then stressed and locked off at the head. They are listed under geotechnical and foundation products in Saudi Arabia, and are usually let as a specialist design and build subcontract.
Saudi uses include tie-backs for deep excavations for towers, metro stations and underpasses in Riyadh, basements near the Red Sea shore in Jeddah, uplift anchors for slabs and tanks below the water table in Dammam, Al Khobar and Jubail, and rock anchors on mountain road cuts and dam abutments in the Asir and Hejaz ranges.
| Anchor type | Saudi applications | Specification points |
|---|---|---|
| Strand anchors | High-load tie-backs for deep shoring, permanent retaining structures | Strand count, design and test load, free length, bond length, lock-off |
| Bar anchors | Shallower tie-backs, hold-down under slabs, rock bolts | Bar grade, diameter, couplers, design, test and lock-off loads as a share of bar strength |
| Rock anchors | Road cuts, slopes, dam and foundation works in hard rock | Rock bond strength from tests, drilling method, head protection |
| Permanent encapsulated anchors | Structures with a long design life, uplift resistance | Corrosion protection class, encapsulation, sheathing, head cover |
Anchors are one part of the retention system. The wall itself may be bored piles installed with piling rigs or interlocking sheet piles, weak strata around the excavation may be treated with soil stabilisation products, and anchor holes are drilled with rotary and down-the-hole drilling equipment. Note that EN 1537 does not cover soil nails, screw anchors, mechanical anchors, tension piles or dead-man anchors, so those need their own specification.
Ground conditions in Saudi Arabia vary from weak limestone and sand in Riyadh to sabkha on the coasts and hard igneous rock in the southwest, so anchor bond lengths and drilling methods change from site to site. Groundwater chemistry decides corrosion protection.
The Saudi soils and foundations code, SBC 303, contains design provisions for expansive, collapsible and sabkha soils. Collapsible soils lose strength when wetted, which matters if drilling fluid, grout or leaking services reach the bond zone, so ask the geotechnical engineer whether the bond length must sit below such layers.
Sabkha and shallow groundwater on the Gulf and Red Sea coasts carry chlorides and sulphates. The Post-Tensioning Institute's guidance, widely used by US-trained designers, classes any anchor with a service life of five years or more as permanent and recommends Class I protection for all such anchors, meaning an encapsulated tendon or an epoxy-coated tendon in a water-tested hole. BS 8081 and EN 1537 leave the protection class to the designer.
Grout and stressing crews work outdoors, so the private sector midday ban, noon to 3 pm from 15 June to 15 September 2026, shapes their shift pattern. Grout sets faster in the heat; batch small volumes, keep materials shaded and do not stress until the grout has reached the strength set in the method statement.
Ground anchors in Saudi Arabia are designed to the geotechnical report and the project specification, which most often names BS 8081 and EN 1537 or, on US-led projects, the Post-Tensioning Institute recommendations. SBC 303 governs the foundation and retaining wall design they serve. Checked October 2026.
| Requirement | Covers | Issuer |
|---|---|---|
| SBC 303 soils and foundations | Geotechnical investigation, excavation, retaining walls, design on expansive, collapsible and sabkha soils | Saudi Building Code National Committee |
| BS 8081:2015+A2:2018 | Design, construction, stressing, testing, monitoring and maintenance of grouted anchors | BSI |
| EN 1537:2013 | Execution of stressed and tested grouted anchors, temporary or permanent | CEN |
| EN ISO 22477-5 | Test methods for grouted anchors | ISO and CEN |
| PTI recommendations for prestressed rock and soil anchors | Corrosion protection classes and testing in US practice | Post-Tensioning Institute |
| Owner approval | Anchors inside Aramco, SABIC or Royal Commission facilities | Facility owner's specifications and vendor lists |
Imported anchor components such as strand, bars, couplers and heads may fall under SASO technical regulations; the guide to SASO and SABER certificates explains how to check before shipment.
Select a specialist that can produce the anchor design, drill in your ground with the right equipment, and test every anchor to the agreed regime. Material suppliers of strand, bars and anchor heads usually sell through these installers rather than directly to the main contractor.
The industrial supplier sourcing guide covers commercial checks, and you can post your requirement with the soil report and anchor schedule to receive comparable Saudi bids.
Price depends on anchor count, length and load, drilling difficulty, protection level and testing. Strand and common bars are available in the Kingdom, while encapsulated permanent kits and special bar systems may come through King Abdulaziz Port in Dammam or Jeddah Islamic Port.