Wellhead equipment in the UAE is the pressure-containing hardware at the top of an oil or gas well: casing and tubing heads, hangers, Christmas trees, wellhead valves and chokes, plus the blowout preventers used while drilling and the casing and tubing below. This page explains the types, how to read an API 6A rating (PSL, PR, temperature and material class) for Abu Dhabi wells, who supplies them, and what drives cost and delivery.
0 suppliers found · 4 subcategories
Skip the search. Post your requirement and we'll connect you with verified wellhead equipment suppliers who quote for your order directly.
Tell us about wellhead equipment in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Wellhead equipment is the stack of spools, hangers and valves that holds the casing strings, seals the annuli and controls flow from a well. In the UAE it is bought mostly by ADNOC operating companies and their drilling and completion contractors, and on ListGCC it is part of upstream oil and gas equipment for the UAE. The four types below cover the well from drilling to production.
| Type | Typical use in the UAE | Governing document and key choices |
|---|---|---|
| Wellhead valves, chokes and safety valves | Master, wing and annulus valves, surface safety valves, adjustable and positive chokes | API Spec 6A: pressure rating, PSL, PR level, temperature and material class; SSV service class |
| Christmas trees for oil and gas wells | Production and injection trees on onshore pads, island wells and platforms | API Spec 6A tree assembly, solid block or composite, actuated valves, sour material class |
| Blowout preventers and well control equipment | Ram and annular BOP stacks on land, jack-up and island rigs | API Spec 16A (4th edition), API Std 53 (5th edition) for system installation and testing |
| Casing and tubing | Surface, intermediate and production casing; production tubing | API Spec 5CT (11th edition, December 2023), grade, connection, sour service grade where H2S is present |
Wellheads meet three neighbouring families. Rigs, top drives and bits that run the casing are under drilling equipment and services; downhole pumps, gas lift and sand control that work below the tree are under production equipment and artificial lift; and logging and well evaluation tools are under exploration equipment.
An API 6A wellhead or tree component is defined by five ratings: rated working pressure, temperature class, material class, product specification level (PSL) and performance requirement (PR). The buyer chooses them from well data; the manufacturer marks them on the part. Getting them right matters more than brand, because they fix materials, testing and documentation.
| Rating | Options in API 6A, 21st edition | What decides it |
|---|---|---|
| Rated working pressure | 2,000, 3,000, 5,000, 10,000, 15,000 and 20,000 psi | Maximum anticipated shut-in pressure at the wellhead |
| Temperature class | K, L, N, P, S, T, U, V; for example U is 0 to 250 °F (minus 18 to 121 °C) | Minimum ambient temperature and maximum flowing fluid temperature; classes can be combined, such as P+U |
| Material class | AA, BB, CC (general service); DD, EE, FF, HH (sour service); ZZ for materials qualified by the purchaser | H2S, CO2, chlorides and pH of the produced fluid |
| PSL | PSL 1, 2, 3, 3G (gas tested) and 4 | Pressure, sour service, H2S level and whether it is a gas well |
| PR level | PR1 or PR2; PR2F for validation to Annex F | Design validation testing of pressure and temperature cycles, load cycles and seals |
Cameron's guide to the 21st edition reproduces API's decision tree for the recommended minimum PSL of primary parts: the level rises with working pressure, with sour service under NACE MR0175/ISO 15156, with high H2S concentration and with gas wells, from PSL 1 for low pressure sweet oil service to PSL 3G or PSL 4 for high pressure sour gas. The tree is guidance to help the purchaser, so the ADNOC specification governs. Surface safety valves need at least PSL 2 and PR2, and boarding shutdown valves at least PSL 3. Abu Dhabi has some very sour gas, described on our oil and gas sector page, so many UAE wells fall in the upper PSLs and the DD to HH material classes.
Sour service equipment is marked with its material class and the maximum H2S partial pressure it is rated for: 0.5 psi, 1.5 psi or NL for no limit. A part marked FF-1,5 is class FF rated to 1.5 psi H2S partial pressure. Check the mark against the well's calculated H2S partial pressure, which is the H2S fraction multiplied by shut-in pressure.
The same guide recommends castings for sour material classes only up to 5,000 psi; above that, it calls for wrought (forged) bodies. In UAE summers the ambient limit is rarely the constraint but the flowing temperature can be, so check that elastomers and seals carry the needed temperature class. Where sand is produced, an SSV can be ordered to Service Class II or III, which adds a 500-cycle sand slurry test under API 6AV1.
Wellhead equipment in the UAE is bought to API specifications written into ADNOC purchase orders, from suppliers registered on the ADNOC Supplier Hub, with ICV scored in many tenders and ECAS-Ex certificates for hazardous-area electrics on control panels and actuators. Registration and ICV are explained on the sector hub. The documents below were checked in API's 2025 catalogue in October 2026.
| Document | Covers | Edition |
|---|---|---|
| API Spec 6A | Wellhead and tree equipment, valves, chokes, hangers, SSVs and BSDVs | 21st edition, November 2018, with addenda to November 2024 |
| API Std 6AR | Repair and remanufacture of 6A equipment, repair levels RL 1 to RL 4 | Check current edition with API |
| API Spec 16A | Ram and annular BOPs, packers and connectors | 4th edition, April 2017 |
| API Std 53 | Installation and testing of BOP systems on land and marine rigs | 5th edition, December 2018 |
| API Spec 5CT | Casing, tubing, pup joints and coupling stock | 11th edition, December 2023 |
| NACE MR0175/ISO 15156 | Metallic materials in H2S service | Edition per ADNOC specification |
| API Spec Q1 and Monogram | Manufacturer quality system and licensed product marking | API |
Wellhead flanges and ring gaskets are API 6A items, not ASME B16.5, so do not substitute process flanges. Our flanges and fittings standards guide explains the difference in end connections, and the valve selection guide for GCC projects covers sour trims and gate valve choices.
UAE wellhead equipment is supplied by the original manufacturers through their Abu Dhabi bases and assembly or service workshops, by authorised agents for smaller brands, and by stockists of gaskets, seals and spares. Because wellheads must interface with existing hangers and profiles, most operators standardise on one system per field and buy spares from the same manufacturer.
Ask for the API licence number of the plant that makes each part, the repair level of any refurbished item under API 6AR, and the UAE service capability for installation and testing. Use our supplier vetting guide, then post your wellhead requirement to receive quotes from UAE suppliers.
Wellhead price and lead time in the UAE follow the rating: higher pressure, sour material class, higher PSL and PR2 testing all add forgings, cladding and inspection. Whether a design is already validated and stocked regionally matters as much. We do not publish prices.
Give suppliers a full data sheet: shut-in pressure, flowing temperature, H2S, CO2 and chlorides, sand and acidizing plans, and the casing programme. Incomplete well data is the most common cause of requotes and delays.