Artificial lift systems are the equipment that adds energy to a well so it keeps producing when reservoir pressure alone can no longer lift the fluid. In the UAE the main options are electric submersible pumps, gas lift, rod pumping and progressing cavity pumps. This page shows how to screen them and brief suppliers.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified artificial lift systems suppliers who quote for your order directly.
Tell us about artificial lift systems in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
An artificial lift system is a downhole or surface installation that lowers the flowing pressure at the bottom of the well or adds energy to the fluid column, so oil reaches the surface at a useful rate. A well needs one when it stops flowing on its own, or when the operator wants a higher rate than natural flow gives. It is the production side of the oil and gas production equipment range, and it is bought by ADNOC operating companies and their well services contractors for onshore fields and offshore islands.
The parent page gives a short guide to the main choices. This page goes deeper into the screening work, because the expensive mistakes happen before purchase: choosing a method from the catalogue, then discovering the well makes more gas, sand or water than the equipment was sized for.
| Lift method | How it adds energy | Needs | Companion page |
|---|---|---|---|
| Electric submersible pump | Multistage centrifugal pump driven by a downhole motor | Electrical power to the well, controlled free gas | Electric submersible pumps |
| Gas lift | Injected gas lightens the fluid column through valves in mandrels | A gas source, compression and a distribution network | Gas lift equipment |
| Rod pumping | Surface unit reciprocates a rod string that works a plunger pump | Shallower, lower rate wells with manageable gas and sand | Rod pumping units |
| Progressing cavity pump | Rotor turns in a rubber stator, pushing fluid up | Viscous or sandy oil and compatible elastomers | Progressive cavity pumps |
| Sand control | Screens hold back formation sand that would wear the lift equipment | Sand analysis and completion design | Sand control equipment |
Other methods exist, such as plunger lift and hydraulic or jet pumping, but the five above account for most requests that reach a UAE supplier.
Screen on six well facts before you look at any brand: liquid rate, depth, gas fraction at the intake, sand production, fluid viscosity and available power or gas. Every method has a window where it works well and a boundary beyond which run life collapses.
High liquid rates point towards ESPs or gas lift. Lower rates in shallower onshore wells suit rod pumps. If you only know the target rate and not the inflow performance, give the supplier the well test, the PVT report and the deviation survey instead of guessing.
A centrifugal pump handles free gas badly, a rod pump suffers gas lock, and a gas lift well uses the gas as the working fluid. As fields mature and pressure falls, the gas fraction changes, so the best method for year one may not be best for year five. A good proposal includes a plan for the second lift method.
Sand wears pump stages and rod pump barrels. If the reservoir produces sand, decide how it will be held back, using screens or a design that tolerates it, before the lift method is fixed. Workover cost matters as much: gas lift valves are changed by wireline, so a failure is a short job, while pulling an ESP normally needs a rig unless a rigless system is used. SLB describes its MMRG-2V-B mandrel as having a tubing-to-casing barrier valve and slickline retrievable valves, which illustrates the wireline approach.
An ESP needs a cable and a surface drive; gas lift needs a compressor, a gas supply and injection lines. In 2009 a GE Oil and Gas and ABB consortium won ADCO contracts worth over 80 million dollars for the Asab gas lift and Sahil gas injection facilities, which shows how large the gas side of the project can be.
As of 2026 the equipment follows API and ISO documents named in the operator specification. The relevant ones by number are ISO 15551 for ESP systems, API Spec 19G1 and 19G2 for gas lift mandrels and valves, API Spec 11E for beam pumping units, API Spec 11B for sucker rods and ISO 15136 for progressing cavity pumps. API 19G1 covers side-pocket mandrels and excludes gas lift valves and wireline equipment, so valves have to be checked separately.
On the commercial side, suppliers to ADNOC companies register with ADNOC and are scored on In-Country Value, administered through MoIAT. Surface electrical equipment in hazardous areas needs ECAS-Ex certification; the UAE product conformity guide explains the scheme.
Run life is a result of monitoring, operating discipline and failure analysis as much as of the hardware. Ask for downhole gauges or surface data that record intake pressure, motor temperature, vibration, current and flow, and agree who watches the data and what action follows an alarm. Without that, a pump can run for weeks outside its envelope before anyone notices.
Insist on failure analysis. Both the Baker Hughes plant in Dammam and the NMDC Energy ESP offering describe dismantle, inspect and failure analysis (DIFA) capability, and that is the feedback loop that turns a failure into a design change. A supplier who will not share teardown findings gives you no way to tell whether the cause was the well, the operation or the product.
Surface conditions in the UAE add a second layer. Variable speed drives, transformers and compressors on open pads face summer heat and dust, so ask for the ambient rating, the derating curve and the filter and cooling arrangements. A drive that trips on a hot afternoon costs production just as a downhole failure does. Rod pumping units and gas lift manifolds are more tolerant but still need shade, lubricant suited to the heat and a plan for sand ingress. These are practical points to write into the purchase specification, not published UAE rules.
A good enquiry fits on two pages and contains the data a designer needs: well test rates, water cut, gas-oil ratio, fluid properties, sand analysis, reservoir pressure, deviation survey, tubing and casing sizes, available power or gas, and the surface constraints at the site. Add the target run life and the operating strategy, such as constant rate or maximum drawdown. Add commercial terms too: delivery point, whether local assembly or repair is required, testing and inspection, spares for the first year, and training. Vendors price against what you ask for, so unclear scope produces offers that cannot be compared.
The large service companies and ESP specialists supply most artificial lift, with local assembly and repair workshops that keep run life up. ListGCC lists Baker Hughes for ESP systems and gas lift mandrels, SLB REDA for ESPs, Halliburton Summit ESP, Borets and Weatherford for rod lift and gas lift products.
NMDC Energy states that its ESP is designed, manufactured and tested in Abu Dhabi, with field service in the UAE, and offers a permanent magnet motor option. This is a vendor claim with no published specification, so treat it as a sign of local capability and ask for the datasheet and test records. For buyers in Abu Dhabi, local manufacture shortens spares delivery and counts in ICV scoring.
Cost follows the lift method, the number of wells, the metallurgy for sour fluids, power and compression needs and the service package. A package that includes monitoring, failure analysis and repair costs more up front and often costs less per barrel over the run.
Lead time depends on local stock, assembly capacity and approvals. Standard rod lift parts and gas lift valves ship faster than a special-alloy ESP or a long cable reel. Ask each bidder for UAE stock levels, repair turnaround, and the date by which a failed unit can be replaced. To compare supply, post your requirement with the well data attached.