Gas lift equipment lifts oil by injecting high-pressure gas into the production tubing through valves set in side-pocket mandrels, which lightens the fluid column. In the UAE it is used on ADNOC onshore and offshore wells with gas available. This page covers the components, standards, gas supply and how buyers specify and source them.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified gas lift equipment suppliers who quote for your order directly.
Tell us about gas lift equipment in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Gas lift equipment is the set of downhole and surface parts that inject gas into a producing well so the fluid column becomes lighter and flows. Downhole it is a string of side-pocket mandrels carrying gas lift valves in the tubing. On the surface it is a compressor, a gas distribution network and injection control at each wellhead. It is one of the lift methods within oil and gas production equipment and a close alternative to the pumping methods under artificial lift systems.
| Component | What it does | What to specify |
|---|---|---|
| Side-pocket mandrel | Tubing joint with an offset pocket that holds a valve, leaving the full tubing bore open | Size, pressure and temperature rating, materials, API 19G1 design |
| Gas lift valve | Opens to admit injection gas at the set pressure or closes to stop flow | Unloading or operating type, port size, test rack opening pressure, back-check |
| Orifice valve and dummy valve | Fixed-size gas entry point and a blank to seal a pocket | Orifice size, latch type |
| Latch and running tools | Hold the valve in the pocket and let wireline install or retrieve it | Match to the mandrel pocket |
| Tubing-to-casing barrier valve | Blocks tubing to casing flow when a valve is pulled | Integral or separate, API 19G2 V0 qualification |
| Surface injection control | Measures and regulates gas to each well | Choke or flow controller, meter, shutdown valve |
| Compressor and dehydration | Raises gas pressure and dries it for the injection line | Discharge pressure, capacity, dew point |
Surface valves at the tree belong to wellhead valves, and the gas itself is moved by gas compressors.
Valves in side-pocket mandrels are installed and retrieved on wireline. Baker Hughes says its side-pocket mandrels allow valves to be installed and removed by wireline, which avoids pulling the mandrel or tubing to repair or replace a valve, and that the pocket accepts gas lift, chemical injection, circulating, dummy, shear orifice and dump kill valves. That is the main operating advantage of gas lift: a failed valve is a slickline job, not a rig job.
SLB goes a step further with a dual-pocket mandrel whose integral tubing-to-casing barrier valve is qualified to API Spec 19G2 V0 and prevents tubing to casing communication when the gas lift valve is removed. Both valves are slickline retrievable. For wells where a barrier is required while the gas lift valve is out, that design removes the need for a separate plug. Ask whether the barrier your operator requires is in the supplier's qualified range.
The gas lift design itself is done by an engineer, using the well data to space unloading valves from the top down to an operating valve at depth. Valve test rack settings must match the design; a valve set wrongly at surface does not open at the intended point downhole, so ask for the calibration record with each batch.
As of 2026 gas lift products are bought to API Spec 19G1 for side-pocket mandrels and API Spec 19G2 for flow-control devices such as valves, with the operator specification naming editions. The scope of 19G1 matters: it covers specifying, selecting, designing, manufacturing, quality control, testing and shipping preparation of side-pocket mandrels, including HPHT equipment above 15,000 psi or 350 degrees Fahrenheit. It excludes the gas lift valves and flow-control devices themselves, latches and wireline equipment, plus center-set mandrels and tubing-retrievable designs. A supplier quoting a mandrel to 19G1 is therefore not by that fact quoting a certified valve.
Other approvals depend on the surface equipment. Electrical equipment in hazardous areas needs ECAS-Ex certification, and suppliers to ADNOC companies register with ADNOC and are scored on In-Country Value. The UAE product conformity guide describes the scheme.
Gas lift is only as reliable as its gas supply. The compressor must deliver injection pressure above the deepest operating valve plus losses in the line, and the gas must be dry enough not to form hydrates or corrode the tubing. When ADCO awarded GE Oil and Gas and ABB contracts worth over 80 million dollars in 2009 for the Asab gas lift and Sahil gas injection facilities, GE supplied centrifugal compressors and ABB the variable speed drive system, which gives an idea of the scale of the surface side.
For smaller programmes, reciprocating compressors are common. Ariel reciprocating compressor frames are used for gas lift and injection duty and are packaged by other manufacturers. Because injection gas is recycled, a leak or a compressor trip affects all wells on the header, so the design should include metering at each well and a way to isolate it.
Continuous gas lift injects gas steadily at a controlled rate and suits wells with good productivity and high rates. Intermittent gas lift injects in slugs to lift a column of liquid, and suits low-rate wells with low bottom hole pressure. Most large ADNOC wells are candidates for the continuous kind; the intermittent kind is a late-life option that needs surface controllers and pays off only for wells that would otherwise be shut in. These are standard engineering practice distinctions, so ask the designer to show the reasoning for the well in question.
Two checks save time. First, ask for the gas injection rate and the lift gas to liquid ratio the design assumes, then compare with what your gas system can deliver at peak demand across all wells. Second, ask how the design behaves when injection pressure drops. A well that stops flowing when the header pressure falls ten percent is a poor candidate for a shared system. Where wells must stay on production, electric submersible pumps are the usual alternative, and rod pumping units serve the shallow, low-rate end.
The common failures are valve leakage, plugged ports, corroded mandrels and unstable injection. Leaking valves recirculate gas and waste compressor power. Sand and scale plug small ports, so the design should keep gas dry and clean. Sour wells need mandrel and valve materials suitable for H2S, which the supplier should state as a material standard, not as a general claim.
Heat affects calibration. A valve is set at a test rack temperature and then operates downhole at a different one, so the design must correct the opening pressure for well temperature. Ask the vendor to show that correction in the design report. At the surface, injection lines and control panels in direct summer sun need heat-rated components and shading. Treat these as specification items for the order, not assumptions.
Gas lift hardware comes from the large completions companies and specialist valve makers. ListGCC lists Baker Hughes gas lift valves and side-pocket mandrels and Weatherford artificial lift and completion products, with compression from Ariel. SLB is a major supplier of mandrels and valves too.
Cost follows well count, mandrel metallurgy for sour service, pressure rating, the number of valves per well and the testing and documentation scope. Lead time depends on local stock and valve calibration facilities in the UAE; mandrels in special alloys are usually built abroad and imported through Jebel Ali or Khalifa Port. A UAE valve test and calibration workshop shortens turnaround for redress jobs, so ask each bidder for its repair location. To compare offers, post your requirement with the well design and injection pressure.