Low voltage switchgear in Saudi Arabia is the LV switchboard or power control centre fed from a distribution transformer that distributes power to motor control centres, sub-main boards and plant loads. This page lists Saudi suppliers and covers the IEC 61439-2 ratings to put in a tender, 60 Hz and fault level checks, separation forms, arc testing, desert and coastal conditions, and the SEC, owner and SASO gates.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified low voltage switchgear suppliers who quote for your order directly.
Tell us about low voltage switchgear in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
In Saudi Arabia, low voltage switchgear is the metal-enclosed LV assembly, built around a main busbar with air circuit breaker incomers and breaker or switch-fuse feeders, that receives power from a distribution transformer and protects every outgoing circuit. It sits inside the switchgear and panels family for Saudi buyers, and on Aramco, SABIC, Ma'aden, water and building projects it is often called the PCC, MDB or LV switchboard.
| Name used in Saudi tenders | Typical location | Key items to specify |
|---|---|---|
| LV switchboard or MDB | Building substations in Riyadh, Jeddah, Dammam and giga-project sites, fed from SEC transformers | Incomer ACBs, bus section, InA and Icw at the transformer fault level, SEC metering arrangement |
| Power control centre (PCC) | Petrochemical and process plants in Jubail and Yanbu, pumping and desalination stations | Withdrawable feeders, Form 4b, owner standard drawings, plant DCS or SCADA interface |
| Sub-main board | Floors, plant areas and utility buildings | MCCB feeders, rated diversity factor, IP rating against sand |
| Capacitor bank panel | Industrial sites with large motor loads | kvar steps, reactors, heat dissipation |
The switchboard is one link in a chain. It is fed through a transformer from medium voltage switchgear and ring main units, it feeds MCCs for pumps and process drives and final distribution boards, and the generator changeover is often an ATS panel beside it.
A Saudi LV switchgear tender should give the assembly rated current (InA), each circuit rating (InC), the short-time withstand current (Icw) and its duration, the peak withstand (Ipk), the rated diversity factor, the form of separation, the IP degree, the design ambient and the 60 Hz rated frequency. These terms come from IEC 61439, and naming them stops bidders quoting different things.
Saudi Arabia's grid runs at 60 Hz while the rest of the GCC interconnection runs at 50 Hz, according to the GCC Interconnection Authority, which links the two through a back-to-back converter station. Breakers, metering, relays and control transformers should all be confirmed for 60 Hz. Fault level matters just as much: Icw is the r.m.s. current the assembly can withstand for a stated time, and ABB's IEC 61439 guide notes that values for 0.2 s, 1 s and 3 s can be assigned separately. Match the duration to the incomer's short-time delay so selectivity does not stress the busbar beyond its rating.
The rated diversity factor tells you how hard outgoing circuits can be loaded at the same time. If buyer and builder do not agree actual loads, IEC 61439-2 Table 101 (reproduced in the ABB guide) assumes 0.9 for two or three distribution circuits and 0.6 for ten or more, and 0.8 for motors up to 100 kW. Process plants where most feeders run continuously should state their real load profile instead of relying on these defaults.
IEC 61439-2 Forms 1 to 4b set how much of the board stays touch-safe while one part is isolated. Form 2 divides busbars from functional units, Form 3 divides functional units from each other, and Form 4b also puts each feeder's cable terminals in their own compartment. Saudi plant owners generally ask for Form 4b with withdrawable feeders on PCCs; Form 2 or 3 is common on building sub-main boards.
Saudi conditions push switchboards towards derating, dust control and corrosion protection. Ratings verified at 35 degrees C mean ambient do not hold in a hot e-house or pumping station, so ask for derated busbar and feeder figures at the declared ambient.
As of 2026, Saudi LV switchgear is built to IEC 61439-1 and -2, with its breakers to IEC 60947-2, and passes through up to three further gates: SEC for utility interfaces, owner vendor approval for industrial plants, and SASO conformity on SABER for imported regulated products. Confirm current requirements with each authority before ordering.
| Gate | Scope | Who decides |
|---|---|---|
| IEC 61439 design and routine verification | Every switchboard | Original manufacturer and assembler |
| IEC TR 61641 arcing class | Where the specification asks for it | Accredited test laboratory report |
| Utility interface and metering | Boards connected to SEC supply | Saudi Electricity Company |
| Vendor and material approval | Oil, gas, petrochemical and mining plants | Saudi Aramco, SABIC, Ma'aden and other owners |
| IECEE CB certificates and SABER certificates | Imported electrotechnical products and components | SASO |
SASO offers IECEE CB scheme certificates for electrotechnical products, based on test reports from a CB testing laboratory. For the import process, read how SASO and SABER certificates apply to industrial equipment.
Saudi LV switchgear comes from global makers' factories and Saudi panel builders licensed to assemble their systems; local assembly can help where a government or semi-government tender scores local content.
Check that the make is on the owner's approved list before comparing prices. Ask a local assembler for its licence, the system maker's design verification reports and its own routine test report. Coordinate with the ACBs and MCCBs specified for the board and the distribution transformers that feed it.
Ratings and owner requirements drive the cost; approvals and breaker supply drive delivery.
To get comparable bids, post your LV switchgear requirement with the single line diagram, fault level, frequency, ambient and the owner's approved makes.
Where LV ends and MV begins, how GIS and AIS differ in size, cost and maintenance, what SF6 rules mean for Gulf buyers, how ring main units work and how to read an MV datasheet.
What replaced the type-tested label, how duties split between the original manufacturer and the panel builder, which reports and certificates to ask for, and how to run a factory acceptance test.
What goes inside an MCC panel, how fixed, plug-in and withdrawable units differ, how to choose starters, and what to check for heat, arc-fault protection and testing in Gulf projects.