An automatic transfer switch (ATS) shifts a Saudi Arabian facility from the grid to a standby generator within seconds of a supply failure and returns it afterwards. This page covers ATS types, switching class, SASO conformity, dust and heat limits in Riyadh, Jeddah and the Eastern Province, and brands that make transfer switches.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified automatic transfer switches suppliers who quote for your order directly.
Tell us about automatic transfer switches in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Which switchgear and panel brands Gulf projects specify, what IEC 61439 design verification and forms of separation mean, how heat affects ratings, and the UAE and Saudi rules.
An automatic transfer switch is a microprocessor-controlled device that monitors voltage and frequency on the main supply, transfers the load to a backup source when the main fails, and switches back once the main is stable. In Saudi Arabia it belongs to the family covered in switchgear and panels for Saudi projects, and it appears wherever a plant, hospital, telecom site or compound cannot wait for a manual changeover.
Types are described by how the sources are handled and by how much you need to keep running during maintenance.
| Type | Typical Saudi use | Key specification points |
|---|---|---|
| Open transition | Commercial buildings, villas, compounds, general plant services | Disconnects from the main before connecting the generator, so a short break occurs |
| Closed transition | Hospitals, data centres, industrial processes sensitive to a blink | Both sources connected for a moment; needs grid operator agreement |
| Soft load | Large plants with high demand | Shares the load between sources while the transfer is made |
| Bypass isolation | Sites that cannot stop for service | Allows testing and maintenance without interrupting supply |
| Single or three phase | Small premises against factories and camps | Poles, amps, short-circuit rating, enclosure |
Choose the transition type from the load, then the construction from the fault level at the point of installation.
Choose PC class for compact generator changeover behind a protective device, and CB class where the switch sits at a main incomer and must break fault current itself. Both classes are defined in IEC 60947-6-1, the standard for low voltage transfer switching equipment. One vendor guide explains that a PC class unit can close onto and withstand a fault but depends on an upstream fuse or breaker to clear it, while a CB class unit is built on circuit-breaker units and can break fault current within its rating.
The detail that causes trouble is coordination. A higher amp rating does not guarantee a higher short-circuit rating, and a PC unit protected by a slow or badly set upstream device may overheat or weld. Ask each bidder for the short-circuit withstand rating with the named upstream device, and for selectivity data if the ATS is part of a larger board. For the board it sits on, see low voltage switchgear in Saudi Arabia and motor control centres.
Saudi sites stress transfer switches with fine dust inland, high plant-room temperatures and, on the Red Sea and Gulf coasts, salt-laden humidity. A switch can sit unused for months and then must move load on the worst day.
The ATS is only as good as its source. See diesel generators for Saudi standby power and gas generator sets, and UPS systems for the loads that must ride through the start-up gap.
As of 2026, Saudi requirements for a transfer switch depend on where it is used: SASO rules for imported electrical products, an explosion-protection certificate in classified areas, and the owner's own specification. Check the current SASO and SABER requirements before you order.
| Requirement | Applies to | Authority or source |
|---|---|---|
| IEC 60947-6-1 | Transfer switching equipment, PC or CB class | IEC; named on specifications and manufacturer data sheets |
| SASO certification route for electrical products | Imported electrotechnical equipment | SASO; certificate types include national recognition and CB scheme routes |
| SASOEX certificate | Equipment for potentially explosive atmospheres, including control boxes | SASO, based on IECEx or ATEX documents |
| Grid operator agreement | Closed transition and parallel operation | The grid or distribution company concerned |
| Owner vendor approval | Government, oil and gas and utility projects | The client's approved manufacturer list |
SASO's electrotechnical page lists three certificate types: an IECEE national recognition certificate, an IECEE CB scheme certificate, and the SASOEX conformity certificate for equipment in explosive atmospheres. Which route a given ATS needs depends on its product group, so confirm with the supplier and the current rules. Our guide to SASO and SABER certificates for industrial equipment walks through the process. Applications typically ask for commercial registration, test reports and manuals, and importers and manufacturers each submit declaration forms.
ATS equipment comes from generator makers that match a switch to their own controller, and from switchgear groups that sell switching devices for panel builders and enclosed units.
Compact units and common controllers are generally held in Riyadh, Jeddah and Dammam, while large, closed transition or bypass versions are built to order and arrive through Jeddah Islamic Port, King Abdulaziz Port in Dammam or Jubail Commercial Port. Project work for utilities and large industry, including Jubail and Yanbu, normally runs on the owner's approved vendor list, so confirm the maker is on it before comparing prices. Our guide on sourcing industrial suppliers in the UAE and Saudi Arabia covers how to confirm a distributor is authorised.
Rating, class and options drive price far more than brand alone. A small PC class unit for a compound generator is a catalogue item; a large CB class unit with bypass and closed transition control, in a floor-standing coated cabinet, is a project order with documentation.
Ask for a lead time in writing, separating factory completion from shipping and customs. Post your requirement with rating, poles, transition type and site conditions to receive comparable quotes.
How to specify an ATS or changeover switch for a standby generator: transition types, 3 vs 4 pole, PC and CB classes, AC-33 ratings, bypass-isolation, Abu Dhabi and SEC requirements and a checklist.
Perkins is a Caterpillar engine subsidiary; Cummins builds engines, complete gensets and alternators. How their generator engines compare by kVA range, packager, support and what to ask in a quote.