A combined cycle plant in the UAE pairs gas turbines with heat recovery steam generators and a steam turbine, so the exhaust heat that a simple cycle plant wastes makes extra electricity. This page explains the block configurations, how UAE heat, humidity and water limits shape the design, which test codes, EWEC procurement rules and Abu Dhabi emissions requirements apply as of 2026, which manufacturers supply the power island, and what drives price and schedule.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified combined cycle plants suppliers who quote for your order directly.
Tell us about combined cycle plants in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
A combined cycle gas turbine (CCGT) plant burns gas in one or more gas turbines, passes their hot exhaust through a heat recovery steam generator (HRSG), and expands the steam in a steam turbine to make more power from the same fuel. In the UAE it is the largest product in the UAE power generation equipment category, and almost all of it is bought through utility procurement: EWEC in Abu Dhabi, DEWA in Dubai and SEWA in Sharjah contract independent power producers, whose EPC contractors then buy the equipment.
Buyers describe a block by how many gas turbines feed each steam turbine and how the machines are coupled. The choice decides footprint, flexibility and how much output survives a single turbine trip.
| Configuration | How it works | What it means for a UAE buyer |
|---|---|---|
| Single-shaft (1 on 1) | Gas turbine, generator and steam turbine on one shaft line | Compact block, one generator and transformer, the whole block stops with the gas turbine |
| Multi-shaft 1 on 1 | One gas turbine and HRSG feed a separate steam turbine generator | Gas turbine can run in open cycle while the steam side is built or maintained |
| Multi-shaft 2 on 1 or 3 on 1 | Two or three gas turbines and HRSGs feed one larger steam turbine | Larger block, good part-load behaviour, steam turbine outage affects more capacity |
| Phased build | Gas turbines run in open cycle first, the steam cycle is added later | Earlier revenue and capacity, but bypass stacks and diverters needed |
| Power and water | Steam from the cycle also drives thermal desalination | Ties water output to power dispatch, so ask how the plant runs when water demand and power demand differ |
Each part has its own page. The topping cycle is covered under gas turbines for UAE utility plants, and the bottoming cycle under steam turbines and condensers. Plants that also export process steam or chilled water are treated as cogeneration and trigeneration systems. Each block connects through generator step-up transformers and auxiliary medium voltage switchgear, all bought as part of the same package.
UAE conditions reduce combined cycle output at both ends of the cycle: hot air cuts gas turbine output, and hot cooling air or seawater raises steam turbine back pressure. A plant must be designed and guaranteed at its summer design point, because that is when the grid peaks.
Ask bidders to guarantee net output and net heat rate at the summer design temperature and humidity given in the EWEC or DEWA specification, plus a curve across the year. Compare inlet cooling options and HRSG supplementary firing on the net output they add at peak hours, against the auxiliary power and fuel they use.
Coastal UAE plants can use seawater cooling, directly or through cooling towers, which keeps the condenser cooler in summer. Dry air-cooled condensers avoid water use but, according to EPRI, typically cost a steam turbine 10% to over 20% of its capacity in the hottest weather. The cooling choice therefore changes the plant's summer rating, its water permits and its auxiliary load.
Desalinated make-up water, dust on the inlet filters and frequent starts as solar output grows all wear an HRSG. Specify the water chemistry regime with the supplier of boiler water treatment chemicals, drains and venting for daily cycling, and fabric expansion joints on the gas turbine exhaust ducts rated for the exhaust temperature.
A UAE combined cycle plant is governed by the utility's power purchase agreement and technical specification, the test codes it names, emirate environmental rules for stack emissions, and MoIAT schemes for equipment and local value. We checked these references in October 2026.
| Requirement | Applies to | Authority |
|---|---|---|
| Power purchase agreement and IPP specification | Utility CCGT plants; the procurer is the sole buyer of output | EWEC, DEWA or SEWA |
| ASME PTC 46 | Overall plant performance tests, including combined cycle plants | ASME, named in the EPC contract |
| ASME PTC 4.4 and PTC 6.2 | Performance tests of gas turbine HRSGs and of steam turbines in combined cycles | ASME |
| Stack emissions monitoring and permit compliance | Energy, industrial and oil and gas stacks in Abu Dhabi | Environment Agency Abu Dhabi |
| ECAS-Ex certificate | Electrical equipment in classified areas such as fuel gas stations | MoIAT |
| ICV certificate | Tenders by government entities and national companies that score In-Country Value | MoIAT |
Since August 2024, Environment Agency Abu Dhabi has connected automated stack monitoring systems at industrial, energy and oil and gas facilities to its own emissions database, with permit compliance reports and alerts when limits are exceeded. New plants are also being designed for future capture: EWEC said in June 2026 that the 2.6 GW Taweelah C plant is designed so carbon capture technologies could be added later. Confirm emission limits and space allowances with the procurer before the layout is fixed. For product conformity, see the ECAS and EQM guide.
A UAE combined cycle plant is supplied as a power island by a gas turbine manufacturer, often with its own steam turbine and generator, inside an EPC contract let by the IPP developer. Two recent examples show the pattern. At Taweelah C in Abu Dhabi, EWEC awarded the project to TAQA with Aljomaih Energy and Water and Sembcorp, with H-class turbines from Siemens Energy, a power purchase agreement to the end of 2050 and commercial operation forecast for 2029. At Hamriyah in Sharjah, GE Vernova supplied H-class gas turbines and steam turbines for a 1.8 GW plant whose three blocks were all running by October 2023.
Other power island suppliers on UAE and regional bid lists are Mitsubishi Power and Ansaldo Energia. For industrial sites that need tens rather than hundreds of megawatts, engine-based plants are an alternative; Wartsila lists up to 54% efficiency for its Flexicycle solution.
Balance of plant suppliers (HRSGs, condensers, pumps, valves, transformers and controls) are usually chosen by the EPC contractor from the procurer's approved list. Read the guide to sourcing industrial suppliers in the UAE, and post your requirement if you are buying balance of plant packages or spares for an operating block.
The cost of a UAE combined cycle plant is driven by the gas turbine class and block size, the cooling choice and the scope of the EPC contract; the schedule is driven by gas turbine factory slots and site construction. Main drivers: