Water tanks and reservoirs in Saudi Arabia store treated water from villa tanks to NWC reservoirs of 188,000 cubic metres per tank. This page compares concrete, steel, GRP and polyethylene storage, summarises the draft SASO polyethylene tank standard, covers heat, dust and hygiene design, lists the standards that apply, and explains what drives price and lead time.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified water tanks & reservoirs suppliers who quote for your order directly.
Tell us about water tanks & reservoirs in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
How one-component and two-component polyurethane, PU/polyurea hybrids and hot-spray pure polyurea differ, where each suits Gulf roofs, decks, wet areas and tanks, and what the data sheets and approvals should show.
Rigid or flexible cementitious waterproofing, where each works (wet areas, tanks, pools, basements from the inside), how thick to apply it, how to cure it in Gulf heat and what to ask suppliers for.
Size a building booster pump set step by step: head from the highest outlet, peak flow from loading units, pressure zones for towers, duty and standby pumps, vessel precharge, noise and the plant room.
Water tanks and reservoirs in Saudi Arabia store treated water between desalination plants, transmission mains and consumers, and they range from villa tanks to reservoirs of hundreds of thousands of cubic metres. They are the storage layer of water infrastructure in Saudi Arabia, bought by the National Water Company and its contractors, developers, compound managers, industrial plants and farms.
This page looks at storage across scales. For specific products see GRP tanks and vessels, plastic tanks and containers and tank fabrication.
| Type | Typical Saudi use | Specify |
|---|---|---|
| Post-tensioned or reinforced concrete reservoir | Strategic and operational storage for cities | Waterproofing, joints, roof, inlet and outlet, mixing, design life |
| Steel tank | Industrial water, fire water and utility storage | Coating system, cathodic protection, foundation, roof and vent |
| GRP sectional tank | Building ground and roof tanks, treated water | Panel thickness, baffles, access, drinking water approval |
| Blow molded polyethylene tank | Above ground storage from 500 to 10,000 litres | Virgin food grade resin, UV stabilised outer layer, dust-tight cover and vent |
| Rotational molded polyethylene tank | Villas, farms, small plants | Capacity, colour, fittings, wall thickness |
The Briman Strategic Water Reservoir in Jeddah, owned by the National Water Company and completed in December 2017, has 11 hydraulically linked circular post-tensioned concrete tanks, each 188,000 cubic metres and about 120 m in diameter and 18 m high. The project cost about US$200 million and was designed for a 100 year life. Its builders used crystalline waterproofing and rapid-setting plugging mortar for cracks and joints, which highlights where leaks start: joints, penetrations and construction cracks.
Jeddah's reservoir was built to handle demand surges during pilgrimages and desalination plant maintenance, so the lesson for smaller owners is the same: storage is resilience, not just capacity.
Choose the material from the water type, the installation and the maintenance plan.
A draft Saudi Standard, SASO DS 2974:2025, covers blow molded polyethylene tanks with or without reinforcement for above ground water storage, for volumes from 500 L to 10,000 L under atmospheric pressure and a normal operating temperature not above 65 degrees Celsius. It requires 100% virgin food grade high density polyethylene for layers in contact with water, a UV stabilised outer layer, and a design that prevents dust or contamination entering through lid, vent and fittings. It is a draft circulated for comment and may change, so confirm the current approved text with SASO.
Roof tanks in Riyadh or Jeddah see strong sun, so use light blocking walls, shading and vents with insect and dust screens. Warm stored water encourages biofilm, and a sealed lid keeps out windblown sand.
Split tanks into two cells so one can be cleaned while the other supplies, provide a sloped floor to a drain, and fit access that allows a person to enter safely. Confined space entry rules apply when cleaning.
Size storage from the daily demand of the building, the reliability of the public supply and the purpose of the reserve, then split it into cells. Residential compounds, hospitals and hotels need to keep running when the network is shut for maintenance, and an industrial plant needs process water through a pump outage. A ground tank feeds booster pumps and a roof tank gives gravity pressure, so check whether the building needs both or whether pressure from the network and a booster set is enough, see booster pumps.
Detailed layout matters as much as volume. Place the inlet and outlet at opposite ends so water does not short-circuit and stagnate, keep an air gap on overflows, and give each cell its own isolation valve. Add level sensors and a low level cut-out for the pumps. After construction, repairs or cleaning, disinfect the tank and flush it before returning it to service, and keep a written cleaning log for the facility manager and the inspector.
Concrete tanks need extra thought in a hot climate. Hot weather concreting, early curing and joint detailing control cracking, and waterproofing should be applied to the surfaces and joints that contact water. Steel and GRP tanks need careful foundations, because the base carries the whole load of the water and settlement stresses the walls and connections.
Water tanks combine product standards, drinking water contact requirements and owner specifications. Confirm what applies to your tank type with SASO, the National Water Company or the project engineer, as of 2026.
| Requirement | Applies to | Who sets it |
|---|---|---|
| SASO DS 2974:2025 (draft) | Blow molded polyethylene water storage tanks, 500 L to 10,000 L | SASO, replacing SASO 2974/2022 once approved |
| SASO-GSO-1831:2021 | Rotational molded polyethylene water storage tanks, cited in the draft | SASO and GSO |
| BS 6920 | Suitability of non-metallic products in contact with water for human consumption, cited in the draft | British Standards Institution, referenced by SASO |
| Owner specification | Concrete and steel reservoirs, waterproofing and testing | National Water Company and project engineer |
| SASO conformity and SABER registration | Regulated products placed on the market | SASO, see our SASO and SABER guide |
For reservoirs, choose a contractor with experience of water retaining concrete and ask for the waterproofing and joint design. For polyethylene and GRP tanks, buy from the manufacturer or an authorised distributor who can show a drinking water contact certificate, wall thickness data and the applicable SASO or GSO conformity.
Storage connects to water pumping stations, water pipeline materials and water meters. Waterproofing is covered in crystalline waterproofing. To compare Saudi suppliers, post your requirement with capacity, material and site.
Large reservoirs need an inspection plan, not only a design. Check the roof and vents for damage and dust ingress, look at joints and wall bases for seepage, inspect the inlet and outlet pipework and valves, and test level instruments and overflow arrangements. In steel tanks, inspect coating condition and corrosion at the floor and the shell, and for concrete look for cracking, efflorescence and exposed reinforcement.
The Briman example shows why waterproofing and joint repair are in scope: its builders used crystalline waterproofing materials, together with a rapid-setting compound for active leaks. Cleaning and disinfection should follow a written method, with the reservoir taken out of service cell by cell so supply continues. Keep inspection records for the owner and the water authority.
Capacity, material, foundation and site access set the price. Polyethylene tanks are often in stock in Riyadh, Jeddah and Dammam, whereas bolted GRP and steel tanks are made to order and concrete reservoirs follow a civil programme. Remote sites add transport and crane cost, and hot weather concreting, testing and disinfection extend schedules. Check lead time against the owner's approval process.