Wind turbines in the UAE are bought for a small number of utility wind farms, island grids and remote off-grid sites, almost always direct from the manufacturer under a supply, install and service contract. This page lists UAE wind turbine suppliers and explains how to match an IEC 61400 turbine class to low UAE wind speeds, which certificates a bid should carry, how heat and dust change the specification, and what sets price and lead time.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified wind turbines suppliers who quote for your order directly.
Tell us about wind turbines in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Most wind turbines in the UAE are large horizontal-axis machines rated above 4 MW with long blades for low wind speeds, alongside a smaller number of compact turbines for remote sites. Turbines are the core product of the UAE wind energy family, which covers the national projects and the wider market; this page goes into the machine itself: types, turbine classes, certificates and contract terms.
The reference installation is the UAE Wind Program launched by Masdar in 2023, where 23 Goldwind GW155-4.5MW turbines were installed across Sir Bani Yas Island, Delma Island, Al Sila and Al Halah in Fujairah. Turbine model names in the industry usually combine rotor diameter and rated power, so the name itself tells a buyer that the design pairs a very large rotor with a moderate generator. That pairing captures more energy from light winds and is the usual answer for low-wind Gulf sites.
| Turbine type | Typical UAE use | What to check in the offer |
|---|---|---|
| Utility onshore turbine with gearbox | Coastal and inland wind farms selling to a utility offtaker | Gearbox oil cooling at high ambient temperature, service intervals, gearbox and bearing spares held in the region |
| Utility onshore turbine, direct drive or medium speed | Island and remote sites where fewer moving parts suit difficult service access | Nacelle and generator weight for crane, barge and road planning; converter cooling |
| Small wind turbine | Off-grid camps, monitoring and telecom stations, hybrid systems with solar and batteries | Design to IEC 61400-2, battery or grid interface, sand sealing of the generator and controller |
Two related categories sit next to this one. Towers, blades, gearboxes and other major parts bought as spares or for repowering are listed under wind tower components and drivetrain spares. Erection, blade inspection and long-term maintenance contractors are under wind farm installation and O&M services.
A turbine class states the wind climate a design is certified to survive. Low average wind speeds at most UAE sites usually point to class III or a manufacturer-defined class S design with a large rotor, but the class must be checked against measured site data, not picked from a brochure.
| IEC 61400-1 class | Reference wind speed (Vref) | What it means for a buyer |
|---|---|---|
| Class I | 50.0 m/s | Strong wind sites; heavier structure than a low-wind site needs |
| Class II | 42.5 m/s | Medium wind sites |
| Class III | 37.5 m/s | Low wind sites; usually paired with the largest rotors |
| Class S | Set by the designer | Special conditions; the certificate lists the actual design values |
Vref is the extreme 10-minute wind speed with a 50-year return period, so it describes the storm the turbine must survive, not the everyday wind it earns from. Each class also carries a turbulence category (A, B or C, from higher to lower turbulence). Ask each bidder for a site suitability assessment that compares your measured data with the design on the main IEC checks: terrain complexity, extreme wind, effective turbulence, wind speed distribution, wind shear and flow inclination.
The power curve deserves the same scrutiny. Hot air is less dense than the standard air used on many datasheets, so a curve quoted at standard density overstates output on a UAE summer afternoon. Ask for the curve at your site's air density and for the guaranteed curve to be verified under IEC 61400-12-1:2022, the standard method for measuring power performance.
Put the climate into the contract as numbers you can enforce: the ambient temperature at which full output is guaranteed, the filter cleaning interval, the blade protection system and the corrosion class. The wind energy overview summarises field data on heat and dust losses from a desert wind farm in Kuwait; the points below turn that into purchase terms.
As of 2026, no UAE technical regulation written specifically for wind turbines was found, so bids are judged on the IEC 61400 series, an independent type certificate and the offtaker's grid requirements. Confirm with the Ministry of Industry and Advanced Technology (MoIAT) whether any imported electrical items need conformity certificates.
| Requirement | What it covers | Who issues or checks it |
|---|---|---|
| IEC 61400-1:2019 (with Amendment 1 of 2025) | Structural design requirements for wind turbines of all sizes | IEC; verified by the certification body |
| IEC 61400-2 | Safety and design of small wind turbines | IEC; verified by the certification body or test lab |
| IEC 61400-12-1:2022 | Power performance measurement (the power curve) | Accredited test laboratories |
| Type certificate and site suitability statement | Proof the design and its class fit the site | Independent certification body |
| Grid connection terms | Fault ride through, power quality, metering | The offtaker or network company, such as EWEC for Abu Dhabi utility projects |
| Conformity certificates for regulated products | Regulated electrical items imported for the project | MoIAT (ECAS and EQM schemes) |
For the import side, the guide to ECAS and EQM conformity in the UAE explains how regulated product lists work. A small turbine without an IEC 61400-2 certificate or test report is a red flag on any remote site where failures are hard to reach.
Utility turbines are sold by the manufacturer, usually to a developer or EPC contractor, with a long service agreement attached; small turbines usually come through distributors or solar and battery integrators. Goldwind supplied the UAE Wind Program, and Vestas supplied the Dumat Al Jandal wind farm in Saudi Arabia, a project co-developed by Masdar.
Among brands profiled on ListGCC, GE Vernova lists onshore turbines in 3 MW, 4 MW and 6 MW classes, including a 4 MW product for extreme wind conditions, plus the Haliade-X offshore turbine. Siemens Energy runs its wind business through Siemens Gamesa, whose onshore range spans roughly 2.6 MW to 7 MW models for different wind classes. For drivetrain parts, Flender makes gearboxes, couplings and generators for wind turbines.
The guide to sourcing industrial suppliers in the UAE and Saudi Arabia covers vetting and agency checks. To collect quotes for turbines or small wind systems, post your requirement with the site location, measured wind data and target capacity.
Utility turbines are built to order, so lead time depends on factory slots, blade and tower fabrication and oversized shipping, while price follows rotor size, the number of units and the service scope. We do not quote prices because they move with steel, currency and order size.