Steel decking in the UAE is galvanized steel sheet roll-formed into a ribbed profile that serves as permanent formwork for concrete floors and, in a composite slab, as the slab's bottom reinforcement. This page covers the deck profiles used in UAE buildings, the design standards consultants call up, coating choices for coastal sites, fire rating and shear connectors, who supplies decking in the UAE, and what sets price and lead time.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified steel decking suppliers who quote for your order directly.
Tell us about steel decking in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Steel decking is cold-rolled, galvanized sheet formed into a ribbed profile and laid across steel beams to carry wet concrete; in a composite slab it then bonds with the hardened concrete and works as tensile reinforcement. It is the floor element of the structural steel package for UAE buildings, spanning between steel floor beams that are usually made composite with the slab through shear connectors.
| Deck type | Typical UAE use | Points to specify |
|---|---|---|
| Re-entrant (dovetail) composite deck, about 50 mm deep | Offices, hotels and residential floors where services hang from the soffit | Near-flat soffit, hanger fixing method, shorter unpropped spans |
| Trapezoidal composite deck, about 60 to 80 mm deep | Car parks, offices and retail on steel frames | Longer unpropped spans, less concrete, stud position in the troughs |
| Deep deck, around 146 mm and deeper | Long-span and slim floor systems | Propping, specialist design, beam type |
| Shuttering (non-composite) deck | Mezzanines in warehouses and pre-engineered buildings, roof decks | Acts as formwork only; slab reinforced conventionally |
Depths and names vary by maker: Tata Steel's ComFlor range has seven profiles, including the 51+ re-entrant deck and 60 and 80 trapezoidal decks, while Kingspan's Multideck range runs 50, 60, 80 and 146. Do not swap one maker's deck for another without the engineer redoing the design, because span tables, stud layouts and fire tables are specific to each profile.
Decks also appear inside pre-engineered steel buildings as mezzanine floors, and every deck job relies on the frame connections made with structural bolts and fasteners.
Steel decking in the UAE is designed to whichever code family the consultant uses for the frame: Eurocode 4 (EN 1994-1-1, with EN 1994-1-2 for fire) or BS 5950 Part 4 on British and European designs, and the Steel Deck Institute's ANSI/SDI SD-2022 on American designs. Dubai Municipality's building bylaw, as amended by Administrative Resolution No. 37 of 2021, lists AISC 360, Eurocode 3 and BS 5950 for steel structures and AWS D1.1 for welding.
| Standard or requirement | Covers | Who sets or calls it up |
|---|---|---|
| EN 1994-1-1 and EN 1994-1-2 (Eurocode 4) | Composite slab and beam design, and fire design | CEN; named by the structural consultant |
| BS 5950 Part 4 | Design of composite slabs with profiled sheeting on BS-based projects | BSI; still used by makers for legacy designs |
| ANSI/SDI SD-2022 | Roof deck, non-composite and composite floor deck in one standard, replacing the 2017 RD, NC and C standards | Steel Deck Institute |
| BS EN 10346 hot-dip coated steel, for example S280GD+Z275 | Deck sheet grade and zinc coating mass | CEN; stated in the maker's data sheet |
| AWS D1.1 welding | Welding on site and in the shop, including welded shear studs | Dubai Municipality bylaw |
| Fire resistance and approval of fire protection products | Composite slab fire period and any added protection | Civil Defence; Dubai Central Laboratory inspects fire protection products in Dubai |
Fire rating usually comes from slab depth and mesh rather than from soffit protection. Tata Steel, for example, states that ComFlor slabs reach their fire resistance with zero soffit protection and gives minimum concrete cover over trapezoidal deck for each fire period, 60 mm for 60 minutes. Use the maker's own tables for the profile actually supplied. These standards and the Dubai bylaw were checked as of 2026.
In the UAE the deck's zinc coating is the main durability question: inside a closed, air-conditioned building a standard Z275 deck is well protected, but an open car park near the coast exposes the soffit to salt-laden humid air for decades. Match coating to exposure, and plan site storage and concreting around the heat.
UAE steel decking comes from local roll-formers who profile galvanized coil, from international makers whose branded decks are imported through Jebel Ali and Khalifa Port, and from pre-engineered building makers that supply mezzanine decks with their buildings. Installation is usually by specialist deck erectors or the steel contractor.
Branded composite decks include Tata Steel's ComFlor range, made in the UK and designed with Tata's ComFlor software, and Kingspan Multideck from its structural products business. Zamil Steel lists steel joists, steel decks and the Hambro D500 composite floor system as part of its building system. For shear connectors and deck fixing, Hilti supplies powder-actuated connectors and fasteners.
When comparing suppliers, ask for the profile data sheet, span and load tables, fire tables, coil mill certificates showing grade and coating mass, and the design calculation if the supplier is designing the deck. Our guide to sourcing industrial suppliers covers licence and reference checks.
Deck prices in the UAE follow galvanized coil prices, so quotes have short validity; the total floor cost also depends on whether the deck spans without props and on how much concrete the profile needs. Local roll-forming is quick once coil is in stock, while imported branded decks add sea freight.
Send the same layout drawings, slab depth, fire period and exposure to each bidder, then post your steel decking requirement to compare UAE roll-formers and distributors.