Solar trackers in the UAE are motorised structures that turn rows of PV modules to follow the sun, raising energy yield on utility plants and large ground-mount systems. This page lists UAE tracker suppliers and explains single-axis and dual-axis designs, IEC 62817 qualification, wind stow and sand protection, how trackers pair with bifacial modules, and what shapes price and delivery.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified solar trackers suppliers who quote for your order directly.
Tell us about solar trackers in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
A solar tracker is a steel structure with drives and a controller that rotates PV modules through the day so they face the sun more directly than a fixed rack would. Trackers belong to the ground-mount end of solar energy equipment in the UAE, and the main reference is Al Dhafra in Abu Dhabi, where Fichtner lists about 33,000 single-axis trackers carrying bifacial modules across 2.1 GWp.
Almost every utility and commercial tracker project in the region uses horizontal single-axis trackers running north to south. Dual-axis units are a niche product for research sites, demonstration projects and some concentrating systems.
| Tracker type | Typical UAE use | Key specification points |
|---|---|---|
| Horizontal single-axis, one module in portrait (1P) | Utility plants and large ground-mount commercial systems | Row length, number of piles, drive per row or shared drive, stow angle and wind speed trigger |
| Horizontal single-axis, two modules in portrait (2P) | Sites wanting fewer piles per megawatt | Torque tube stiffness, dynamic wind behaviour, rear-side shading on bifacial modules |
| Independent-row versus linked-row single-axis | Irregular plots versus large flat desert sites | Number of motors, terrain following, cabling and controller count |
| Dual-axis | Test benches, demonstration and concentrating PV | Pointing accuracy, maintenance access, cost per watt |
Trackers are an alternative to fixed-tilt ground-mount and rooftop mounting systems, which win on small, irregular or rooftop sites where moving parts are not worth the upkeep. Tracker geometry also affects module choice, so agree the format with the PV module supplier early.
A tracker is a machine left outdoors for decades, so the questions in the UAE are how it protects itself from gusts, how its moving parts cope with fine sand, and how its electronics survive summer heat.
Trackers protect themselves by moving to a stow angle when wind speed passes a set threshold. Ask each vendor for the stow angle, the trigger speed, how quickly all rows reach stow, and what happens if the controller loses power or communication. Wind tunnel and dynamic analysis reports for the exact row configuration matter more than a brochure statement.
Fine dust gets into slew drives, gearboxes and bearings. Ask for the ingress protection ratings of drives and controllers, whether bearings are self-lubricating or need greasing, and the planned maintenance interval. Soiling also matters for yield: IEA PVPS research estimates a 3 to 5 percent annual output cut worldwide from soiling, with arid regions hit hardest, and trackers make robotic cleaning possible because rows can be parked flat for the cleaning machine.
Self-powered trackers carry a small module and battery at each row so they can stow without grid power. In UAE heat, battery life is the weak point, so ask for the battery chemistry, rated operating temperature and replacement interval, and for the controller enclosure rating.
Bifacial modules on trackers pick up reflected light from bright sand. Rear-side shading from torque tubes and drives reduces that gain, so ask the vendor for its bifacial yield model and how the structure keeps the rear of the modules clear.
As of 2026, trackers are not listed in the UAE's federal solar products control scheme in the same way as modules and inverters; the controls come from international qualification standards, structural design to project specifications, and the developer's own technical requirements. Confirm with MoIAT whether any tracker component you import falls under a product scheme.
| Requirement | What it covers | Who applies it |
|---|---|---|
| IEC 62817 (design qualification of solar trackers) | Tests on key components and the complete tracker, plus a defined specification sheet | Accredited test laboratories; required by most owners' engineers |
| Structural and foundation design | Wind loads, pile design and soil conditions for the site | Project structural engineer, against the project specification |
| Corrosion protection | Galvanising thickness and coatings for steel members and fixings | Project specification, checked at inspection |
| Commissioning and grid connection | Plant-level testing and connection to the network | Owner's engineer and the utility (EWEC, DEWA or the relevant authority) |
IEC 62817 includes tests that separate tracker designs likely to fail early from sound ones, but it does not certify structural or foundation design, which depend on the local site and soil. That is why piling tests and geotechnical surveys stay part of every UAE tracker project. Steel members are usually protected by hot-dip galvanizing for structural steel, so confirm the coating class for the site and how cut ends are treated.
Tracker supply in the UAE is a project business: a small number of international tracker manufacturers sell directly to developers and EPC contractors, often with steel members fabricated in the region and drives and controllers shipped from the maker's own lines.
Ask every bidder for the IEC 62817 report, a reference list of operating plants in desert climates, the stow logic, spare parts held in the UAE, and the response time for service. To benchmark offers, post your tracker requirement and compare responses, and see our guide on vetting industrial suppliers in the UAE.
Tracker cost is driven mostly by steel and by how many piles and drives the design needs per megawatt; lead time depends on engineering, pile testing and fabrication slots.