Project cargo services in the UAE move heavy, oversized and high value industrial equipment such as transformers, pressure vessels, turbines and plant modules from the factory to site, with engineering, port handling, lifting, lashing, permits and escorts planned as one operation. This page lists UAE providers and explains the planning, rules and cost drivers.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified project cargo services suppliers who quote for your order directly.
Tell us about project cargo services in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Project cargo is any shipment too heavy, long, wide, tall or valuable to travel as ordinary containerised freight, and project cargo services are the engineering and logistics that move it safely. In the UAE it is the specialist end of freight and shipping services for UAE projects, used by oil and gas, power, desalination, construction and rail contractors.
Typical cargo includes transformers and switchgear skids, columns and heat exchangers, generator sets, rotating equipment, structural steel modules and heavy machinery. The deciding question is whether the unit fits inside a container. If not, it goes as out-of-gauge (OOG) on a flat rack or open top, as break bulk, or on a ro-ro vessel; break bulk shipping and container shipping cover the standard options.
| Method | Suited to | Planning points |
|---|---|---|
| Flat rack or open top container | Machinery just over container dimensions, pipe, steel | Over-height or over-width charges, stowage position on the vessel, lashing to the rack |
| Break bulk vessel with ship's gear or port cranes | Large single pieces, vessels, towers, heavy modules | Hook weight, crane radius, tweendeck or deck stowage, weather limits |
| Ro-ro | Wheeled and tracked equipment, trailers, prefabricated units on trailers | Axle loads, ramp angles, gross weight per axle line |
| Chartered vessel or heavy lift ship | Very heavy modules, multi-piece projects | Laycan dates, berth, discharge sequence, port permits |
A heavy load is planned backwards from the site: the lift at the site, the route, the trailer, the permit, the port handling and only then the ocean leg. Doing it in that order avoids discovering a bridge or a gantry that the load cannot pass.
The provider issues a lifting and lashing plan with weights, centre of gravity, lifting points, spreader and sling selection, ground bearing checks and the cranes involved. For the crane side see mobile cranes and crane hire services. Cargo-securing hardware is chosen for sea transport as well as road: Cordstrap, for example, says its lashing and strapping products are CTU Code and CSS Code compliant, and the IMO describes the CTU Code as a non-mandatory global code of practice for packing and securing cargo transport units. See Cordstrap composite lashing systems for container and flat rack securing.
DP World lists specialised project cargo and out-of-gauge handling capabilities among Jebel Ali's yard services, alongside break bulk and ro-ro. Confirm which terminal, berth and crane capacity your piece needs before it is booked, and the storage period after discharge.
Roads in each emirate are controlled by their own authority. When the RTA linked its permit system with Dubai Police in 2021 it described oversized cargo moving between 02:00 and 05:00 under RTA permits, and in March 2026 Abu Dhabi Mobility reported 24-hour permit issuance for heavy vehicle movement on named roads, with companies applying through TAMM. Treat both as examples and re-check with the authority before planning a convoy. The haulage side is covered under heavy haulage and transport and low bed trailers.
As of 2026 project cargo follows the same customs rules as other imports, plus the permits for the vehicles that carry it. Owner requirements, for example ADNOC group HSE and lifting standards, are set by the project contract.
| Requirement | Applies to | Authority |
|---|---|---|
| Customs declaration, with temporary admission where equipment is re-exported | Every import, including contractor equipment | Customs authority of the emirate of entry |
| Oversize or overweight vehicle permit | Road moves of abnormal loads | RTA in Dubai, Abu Dhabi Mobility in Abu Dhabi |
| Verified gross mass of containers | Packed containers and flat racks loaded on ships | SOLAS regulation VI/2 |
| Cargo securing practice | Containers, flat racks and road units | IMO/ILO/UNECE CTU Code (non-mandatory), plus owner specifications |
| Product conformity | Regulated goods inside the project package | MoIAT (ECAS or EQM) |
Read the related guide on ECAS and EQM product conformity and the page on customs clearance services before booking, since a held certificate can strand a heavy unit at the quay.
Choose the provider that can show comparable moves, the engineering behind them and the HSE record, not just a fleet list. Ask for the following before awarding:
For quotes on the same scope, post your requirement with drawings, weights and dimensions. The sourcing guide for the UAE and Saudi Arabia covers checking a company's licences.
Cost follows the heaviest and most awkward piece, not the total tonnage: special equipment, engineering time, escorts, permits and standby. Schedules move with vessel space, permit approval and crane availability.
Summer heat matters for the work on deck, because loading, rigging and lashing are outdoor tasks. The MoHRE midday break from 15 June to 15 September restricts direct-sun work between 12:30 and 15:00, so plan lifts for early morning. Our guide to heat stress and PPE for outdoor work in the Gulf covers crews. Allow extra for permit validity: a permit tied to a date window lapses if the vessel is late.