Logistics park facilities in the UAE are ready-built, multi-tenant warehouse estates near ports and airports, with loading docks, yards and often bonded or temperature-controlled space. This page explains what a park offers compared with a stand-alone warehouse, what to check on power, height and customs status, and how to compare parks.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified logistics park facilities suppliers who quote for your order directly.
Tell us about logistics park facilities in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
A logistics park is a managed estate of modern warehouses that tenants lease as one or more units, usually beside a port, airport or main truck route. It is one of the service groups on the UAE free zones and industrial zones page, and it is the quickest way to get Grade A storage without a build programme.
Parks differ from a lone shed in three ways: the estate has shared roads, security and sometimes customs support; the units are built to a repeated design so you can add or release space; and the landlord is one institutional party instead of many private owners.
| Facility | Typical use | What to check first |
|---|---|---|
| Dry general warehouse | Distribution, e-commerce, project stock | Clear height, floor loading, number of dock doors, truck apron depth |
| Temperature-controlled unit | Food, pharma, chemicals needing set ranges | Design temperature, backup power, who maintains the cooling plant; see cold storage rooms |
| Bonded or free zone unit | Storage and re-export without paying duty until goods enter the mainland | Customs status, zone licence needed, procedure to move goods onshore |
| Multi-tenant unit with office | Regional distribution hub for one tenant | Office share, parking, canteen and worker access |
| Build-to-suit unit | Large tenant with a specific layout | Lease length, who funds the shell, handover date |
If your stock does not need park-grade space, plain warehouses for rent may cost less. If you have your own plant to build, see industrial zone plots.
The best documented are in Dubai, where Jafza runs a park inside its zone. Gulf News reported in March 2025 that Jafza was adding a second phase of 360,000 square feet at a cost of AED 90 million, taking the Jafza Logistics Park above 922,000 square feet. Phase 1 (562,507 square feet, completed November 2023) was reported fully leased before completion. The new space includes temperature-controlled warehouses, loading docks, offices and more power.
On its own website Jafza describes the park as 16 units with 46,112 square metres of leasable flexible space and lists pre-built warehouses for storage and light manufacturing, with leasing rates starting as low as AED 400 per square metre (as shown in 2026; confirm the current tariff). These are headline figures from the zone, and the rate that applies depends on the unit and term.
A well-built park unit handles heat better than an older shed, but you still need to check the envelope, cooling and docks against your goods.
You need a licence for the activity, a lease for the unit, and Civil Defence approval for the fit-out and storage. As of 2026 the u.ae portal says a free zone licence is issued within 14 working days of approval after an online application, but customs and Civil Defence steps run separately.
| Requirement | Applies to | Authority |
|---|---|---|
| Trade licence for storage or distribution | Every tenant | Free zone authority, or the emirate's economic department onshore |
| Lease for the unit | Every tenant | Park landlord or zone authority |
| Tenancy registration | Leases in Dubai; the Ejari service registers tenancy contracts | Dubai Land Department, or the zone's own procedure |
| Customs status and declarations | Bonded storage and goods moving between zones and the mainland | Customs authority of the emirate |
| Civil Defence approval for racking, storage class and fit-out | Any storage unit, more so for flammables | Civil Defence of the emirate |
| Product conformity | Regulated goods placed on the UAE market | MoIAT; see the ECAS and EQM guide |
Fire detection and suppression upgrades come from contractors under fire protection; the Civil Defence approval guide explains the equipment side.
Pick the park by where your trucks, ships and customers are, then pick the unit by how the building will handle your goods.
For the paperwork around setting up in a zone, see free zone company setup and economic zone services.
Rent per square metre depends on the park, unit type and lease length, and the fit-out and licence add to it. Headline rates in announcements exclude service charges, racking, permits and the staff transport you need around the site.
To get current offers for your size and port, post your requirement. The sourcing guide covers how to verify a landlord or provider.