Greenhouse climate control in the UAE is the cooling, ventilation, shading and control equipment that keeps a covered crop alive through summer: exhaust fans, wet pads, high-pressure fog, circulation fans, screens and a climate controller with sensors. This page shows how to size and check a cooling bid for UAE conditions, which approvals apply as of 2026, how to pick a supplier and what moves price and delivery.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified greenhouse climate control suppliers who quote for your order directly.
Tell us about greenhouse climate control in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Greenhouse climate control is the set of fans, wetted pads, foggers, vents, screens and a controller that hold temperature and humidity inside the house within a range the crop tolerates. It is one part of the wider greenhouse and protected cultivation equipment category in the UAE; this page goes into the cooling and control package only, which is the part that decides whether a UAE greenhouse can crop between June and September.
Most UAE enquiries combine several of the components below. Buy them as one engineered package where possible, because a fan bank sized without the pad, or a fog line installed without a controller that stages it, rarely meets the brief.
| Component | What it does | What to specify |
|---|---|---|
| Exhaust fans | Pull air through the house, from the pad wall to the fan wall | Rated airflow at 0.1 inch water static pressure, fan diameter, motor power, shutters, guards |
| Evaporative pads, pump and sump | Cool incoming air by evaporating water | Pad media and thickness (4 or 6 inch cellulose), pad area, pump flow, sump volume, bleed-off |
| High-pressure fog | Cools and humidifies with very fine droplets inside the house | Pump pressure, nozzle size and spacing, line material, water treatment, anti-drip valves |
| Circulation (HAF) fans | Mix air so the crop sees an even temperature | Number, throw, mounting height |
| Roof and side vents | Natural ventilation in the cooler months | Vent area, motor and rack drive, insect screen on the opening |
| Shade and thermal screens | Cut solar load in summer and hold heat on winter nights | Shade percentage, material, drive system, light sensor control |
| Climate controller and sensors | Stages every device to a setpoint and logs conditions | Number of stages and zones, aspirated sensor box, weather station, alarms, remote access |
The cover and frame carry this equipment, so check fan openings and pad walls against the greenhouse structure and cover being supplied. Lower-cost sites that only need shade and airflow are often better served by shade and insect net houses, which need little or no powered cooling.
Start from airflow per floor area, then size the pad, pump and sump to that airflow. UConn Extension gives a design rate of 8 cubic feet per minute (cfm) per square foot of floor, with fan capacity taken at 0.1 inch of water static pressure, and says the rate has to be raised when summer light exceeds 5,000 foot-candles in an unshaded house or when the pad-to-fan distance is under 100 feet. Summer sun in the UAE is well above that light level, so expect a bidder either to add shade or to increase the airflow.
Use these as a sense check on a quote, not as the design. A UAE contractor should show the calculation for your floor plan and summer design condition.
A pad cools air toward its wet bulb temperature, so dry air cools far more than humid air. UConn's example: 90°F outside air leaves the pad at about 67°F when relative humidity is 30%, but only at about 82°F when it is 70%. Inland farms around Al Ain and the Western Region get more from a pad than coastal plots in Dubai, Abu Dhabi or Ras Al Khaimah during humid weeks. On the coast, growers add shade screens, fog, or mechanical cooling for high-value crops, and the controller has to know when the pad has stopped helping.
Every gallon evaporated absorbs about 8,700 Btu, which is why pad and fog systems use a lot of water in a UAE summer. Brackish well water concentrates salts in the pad and sump; UConn advises a continuous bleed-off or regular sump flushing where salt is high, screening returned water at 50 mesh, and running the fans for half an hour after the pump stops so the pad dries. Fog systems need cleaner water again, usually from reverse osmosis, or nozzles block within weeks. Size water treatment for the cooling load together with irrigation and any hydroponic nutrient system on the same farm.
A climate controller turns the equipment on in stages as the inside temperature rises, so the house is not over-cooled or over-watered. One example sequence in trade guidance starts an upper gable fan, then closes the shade system, then opens vents and starts the endwall exhaust fans, and only switches on the evaporative cooling pump as the last stage. A UAE summer sequence follows the same logic: screen, fans, then pad pump or fog.
Independent records help settle disputes about performance. Tinytag temperature and humidity loggers can sit next to the controller sensor to verify the cooling meets the contract figures. For fog cooling, Fogco high-pressure misting pumps and nozzles are one source of 1000 PSI pump units and anti-drip nozzle lines. If you add LED grow lights in a propagation or indoor room, include their heat in the cooling calculation.
There is no single UAE certificate for a greenhouse cooling system. The electrical items need product conformity where they fall into a regulated category, and the design follows engineering practice named in the contract. This reflects sources checked as of 2026; confirm scope with MoIAT and your municipality before ordering.
| Requirement | Applies to | Authority or source |
|---|---|---|
| ECAS or EQM product conformity | Fans, pumps, controllers, motors and wiring accessories that fall in a regulated category | Ministry of Industry and Advanced Technology (MoIAT) |
| ANSI/ASAE EP406 engineering practice for heating, ventilating and cooling greenhouses | Heating, natural ventilation and fan ventilating and cooling system design, when named in the specification | ASABE (the 2003 revision EP406.4 is the copy we could open; check the current edition) |
| Extension sizing rules (airflow per floor area, pad face velocity, pump and sump) | Checking a contractor's cooling calculation | University extension guidance, for example UConn |
| Electrical installation and connection | Panel, cabling, earthing and the supply to fans and pumps | The emirate's electricity authority and a licensed electrical contractor |
Our guide to ECAS and EQM certification for products sold in the UAE explains how to check whether a fan or controller needs a certificate and how to verify one.
Pick the supplier who will commission the system and fix it in August, not only the lowest equipment price. Climate control is installed by turnkey greenhouse contractors, by cooling specialists who retrofit existing houses, and sold as parts by stockists.
Ask each bidder for the design summer condition used, the airflow and pad calculation, the controller staging logic, references from operating UAE greenhouses and a spares list held in the country. The guide to sourcing and vetting industrial suppliers in the UAE and Saudi Arabia covers RFQ structure.
Price follows the cooling method and the control level more than the floor area. A ventilated house with screens costs least, pad-and-fan sits in the middle, high-pressure fog adds pumps and water treatment, and chilled-water or direct expansion cooling costs most to buy and run.
Pads, nozzles and common fan sizes are often held locally; climate computers and large fan banks may be made to order. Commission before May so the system is proven before the hottest months. When your brief is ready, post your requirement to get quotes from UAE greenhouse cooling suppliers.