Green hydrogen production equipment in the UAE is the electrolyser plant, with rectifiers, water treatment, purification and compression, that makes hydrogen from water using solar or other renewable power. This page lists UAE suppliers and explains electrolyser technologies, how water, heat and the solar profile shape a plant, the ISO 22734-1 and Abu Dhabi requirements as of 2026, and what drives price and lead time.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified green hydrogen production suppliers who quote for your order directly.
Tell us about green hydrogen production in UAE and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Green hydrogen production equipment is the electrolyser plant that splits water into hydrogen and oxygen using renewable electricity, together with the power, water and gas treatment systems around it. It is the production end of the hydrogen and fuel cells category for the UAE, which sets out the national targets; this page goes into the plant itself. The hydrogen it makes is then compressed and held in hydrogen storage solutions or used directly, for example in fuel cell power systems.
The electrolyser stack is often less than half of the scope. A complete package, as tendered in Abu Dhabi and Dubai, normally includes these blocks:
| Block | What it does | What to specify |
|---|---|---|
| Power supply | Transformers and rectifiers convert grid or solar AC to the DC the stacks need | Rated MW, DC current and voltage range, harmonics, efficiency at part load |
| Water treatment | Turns desalinated or treated water into the demineralised feed the stacks need | Feed source, conductivity limit, reject handling, consumption per kg |
| Electrolyser stacks | Split water into hydrogen and oxygen | Technology, number of modules, energy use per kg, degradation, stack life |
| Gas separation and purification | Remove water and oxygen traces from the hydrogen | Outlet purity, dew point, oxygen content |
| Compression and storage | Raise pressure for storage, pipelines or trailers | Outlet pressure, buffer volume, compressor type |
| Controls and safety | Plant control, gas detection, venting and shutdown | Hazardous area classification, safety integrity, remote monitoring |
Four water electrolysis technologies are offered today: alkaline, proton exchange membrane (PEM), anion exchange membrane (AEM) and solid oxide (SOEC). Alkaline and PEM make up most installed and contracted capacity; AEM and solid oxide are newer and mostly offered at smaller scale.
Whatever the technology, physics sets a floor: the higher heating value of hydrogen is about 39.4 kWh per kilogram, so real plants use more than that per kilogram. Ask each bidder for guaranteed system energy use per kilogram at the plant battery limit, not stack-only figures.
In the UAE the hard design questions are water, heat and the shape of the solar power profile. Each changes the plant size and cost more than the choice of stack supplier.
Each kilogram of hydrogen needs about 9 kilograms of water by simple chemistry, plus losses in treatment. UAE plants take water from seawater desalination or treated effluent, then polish it in reverse osmosis units and demineralisation plants. Agree the feed quality, who supplies the treatment train and where the reject goes.
Stacks and rectifiers reject a large share of their input power as heat. On a 45 to 50 degree C summer day dry coolers lose capacity, so ask for output and efficiency at the site design temperature, and the cooling water or chiller load that goes with it.
A plant fed only by solar PV in the UAE runs at full load for part of the day. Decide whether to oversize the electrolyser, add battery storage or buy grid power, because it sets the capacity factor and the cost per kilogram. Dust on panels and in rectifier air intakes needs a cleaning and filtration plan.
As of 2026 UAE electrolyser packages are specified to international ISO, IEC and ASME standards, while the Department of Energy in Abu Dhabi, Civil Defence and the zone authority approve the plant. Check which editions each certificate covers.
| Requirement | Applies to | Authority |
|---|---|---|
| ISO 22734-1:2025 | Safety of hydrogen generators using water electrolysis; replaced ISO 22734:2019 in July 2025 | ISO TC 197; owner's engineer and certifier |
| ASME B31.12 | Hydrogen piping and pipelines inside and beyond the package | ASME, through the owner specification |
| ISO 14687 | Hydrogen quality where the product goes to fuel cells or vehicles | ISO |
| Abu Dhabi Low-Carbon Hydrogen Policy (2023) | Industry principles, safety and consumer protection standards | Department of Energy, Abu Dhabi |
| ECAS or EQM certificate | Regulated electrical products and equipment for explosive atmospheres | MoIAT notified bodies |
| Civil Defence approval | Fire protection, gas detection and plant layout | Emirate Civil Defence |
Many buyers still see certificates issued against ISO 22734:2019, which also covered performance; ask which edition and which parts a certificate covers. The ECAS and EQM guide explains MoIAT conformity for electrical equipment.
The reference point for UAE buyers is the DEWA green hydrogen project at the Mohammed bin Rashid Al Maktoum Solar Park, built with Expo 2020 Dubai and Siemens Energy. It started in May 2021 and by December 2024 had produced about 90 tonnes of hydrogen at roughly 20 kg per hour, with a tank holding up to 12 hours of production, the Dubai Media Office reported. Larger projects follow the National Hydrogen Strategy and the hydrogen oases concept described on the parent hub.
Electrolyser packages for the UAE are supplied by international manufacturers through EPC contractors, with local partners for installation and service. Buy from the manufacturer or its authorised integrator; stockists do not hold electrolysers.
Balance of plant comes from neighbouring categories: rectifiers, water treatment, and fixed hydrogen gas detection. Smaller users who only need a steady supply may find delivered industrial hydrogen gas cheaper than owning a plant. The supplier sourcing guide covers checking authorisation.
Cost per kilogram depends more on electricity price and capacity factor than on the stack price, while lead time depends on module manufacturing slots and the balance of plant.
Post your requirement with power source, hydrogen output, pressure, purity and water source to reach UAE electrolyser suppliers.