Loading and unloading arms in Saudi Arabia are the transfer arms at export jetties, bulk plants and chemical terminals that move crude, fuel, LPG and chemicals between storage and ships, trucks or rail cars. Marine arms are specified to OCIMF MLA4, and big projects add Aramco rules and iktva scoring. This page covers types, standards, buying routes and costs.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified loading & unloading arms suppliers who quote for your order directly.
Tell us about loading & unloading arms in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Saudi Arabia has export and import jetties on two coasts, large chemical complexes at Jubail and Yanbu, and a dense network of fuel depots and bulk plants inland. Each has a different arm requirement. The parent page on storage tanks and terminals in Saudi Arabia shows where arms sit in the terminal. Here we start from the buyer's problem: what is on the other end of the connection?
| Receiving end | Arm choice | Questions to settle first |
|---|---|---|
| Tanker at a deep water jetty | Marine loading arm with hydraulic coupler and emergency release | Vessel size range, manifold layout, tidal and swell range, cargo |
| Chemical parcel tanker | Marine arm in stainless steel or duplex, with purge and drain | Compatibility, vapour return, nitrogen blanket |
| Cold liquid carrier | Cryogenic marine arm | Insulation, thermal movement, hold-time limits |
| Road tanker at a depot | Top loading arm or bottom loading arm | Fill method, flow rate, vapour recovery, overfill interlock |
| Rail tank car | Top unloading arm, sometimes with a heated line for viscous products | Spur layout, car dome height, product hazards |
Another question is automation. Larger sites power the arm and link it to terminal shutdown. Small depots often run mechanical arms balanced by a counterweight and moved by the operator.
OCIMF's fourth edition (2019) of the Design and Construction Specification for Marine Loading Arms is a guide for owners and vendors designing and buying marine arms. It covers applications, variability, operating envelopes, products transferred, servicing, manifold spacing, jetty and piping layouts and arm styles, and it comes with tables the owner fills in. Most Saudi jetty projects cite it and then add owner requirements.
Two practical points follow. First, fill in the tables properly: the supplier prices what you state, and a vague envelope gives a vague price and later variation orders. Second, treat safety release as part of the arm. An Inspenet explainer describes the OCIMF sequence in which emergency shutdown stops the transfer, the release system closes isolation valves, and only then does the powered emergency release coupler part the arm from the ship. The explainer also notes that API 2610 covers terminal and tank facilities but does not replace MLA4 for arm design. Ask your supplier for closure time, hydraulic circuit and the control interface to the terminal shutdown system.
Tank-side hardware that feeds the arm is on tank farm equipment, and for the valves in the manifold see pipeline valves.
Red Sea and Gulf jetties are hot, humid and salty. Inland depots are dusty and see wide temperature swings. The practical consequences:
None of these is a Saudi regulation, so write them into the specification rather than assuming a supplier will add them.
A short enquiry checklist helps. State the product and its flash point, the maximum flow rate and line pressure, the vessel or vehicle sizes, the manifold or coupling standard on the other end, the area classification, and the power and control supplies available at the berth. Add the site coastline or inland location, because a supplier will price marine paint, stainless hydraulics and spares very differently for Yanbu than for an inland depot.
As of 2026, a Saudi loading arm is bought against international guidance and the owner's specification. SASO and SABER apply to some regulated imported products, and iktva scores local content on Aramco work.
| Item | Relevance | Comment |
|---|---|---|
| OCIMF MLA4 (2019) | Marine arm design and procurement | Base document for most jetty enquiries |
| API 2610 | Terminal and tank facility design and operation | Context for arm interfaces |
| Owner standards | Materials, inspection, spares, documentation | Aramco and joint venture specifications |
| SASO and SABER | Conformity for regulated imports | Applies to certain electrical items, depending on the product |
| iktva | Aramco's local content programme | Aramco says its initial 70 percent target was reached in early 2026 and the next is 75 percent by 2030 |
Our SASO and SABER guide explains which certificates matter for imported industrial equipment, and our LNG storage and crude oil tank pages show what the arm connects to on the storage side.
Away from the coast, most Saudi buyers deal with loading racks at fuel depots, bitumen and chemical plants rather than jetties. A rack is a structure with one or more bays, each carrying a top or bottom arm, a pump or gravity line, a meter, a grounding monitor and a shutoff tied to the truck's overfill sensor. When a rack is specified, ask how many bays load at the same time, what product changes between bays, and how vapour is returned or treated. A rack designed for gasoline and diesel on bottom loading will not suit hot bitumen on a top arm, so keep the product list honest and include the worst case.
Think about the people too. Drivers arrive from different companies, so arms should be easy to connect with gloves in summer heat, interlocks should be visible, and the bay should be shaded. Spare seals, couplers and counterweight springs belong on the spares list. Uptime at a depot is judged in trucks per hour, and a stuck arm costs a queue.
Marine arms come from international manufacturers, usually through a regional office or agent, and often as part of an EPC package. Road and rail loaders come from the same makers or from industrial distributors. A stockist can help with spare couplers, seals and some standard loaders, but should provide the maker's data sheet and traceability.
Marine arms are made to order. Time and money follow the design envelope and what is attached to the arm.
For quotes from several Saudi suppliers, post your requirement with the product and jetty details.