Thickeners and clarifiers in Saudi Arabia are gravity settling tanks that concentrate solids or clear process water at mines, mineral plants and water works. This page explains how they differ, which types suit tailings and water recovery in a desert climate, how licensing and SABER touch a purchase, and how to compare suppliers.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified thickeners & clarifiers suppliers who quote for your order directly.
Tell us about thickeners & clarifiers in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Thickeners are built for dense underflow and clarifiers for clear overflow, and most Saudi mineral plants need the thickener first and clarification second. Both settle solids by gravity with flocculant help, and both sit in the mineral processing equipment range for Saudi Arabia.
One maker's guidance says clarifiers treat slurries under 5 per cent solids by weight and aim for suspended solids below 100 ppm, with large shallow tanks and light rakes. Thickeners use higher side walls, steeper floors and heavier mechanisms. Another reference puts thickener underflow at 35 to 50 per cent solids by weight and spiral rake units up to 150 ft in diameter.
| Type | Saudi use | What to specify |
|---|---|---|
| Conventional thickener | Tailings and concentrate dewatering | Diameter, rake torque, underflow density, feed well |
| High-rate and high-compression thickener | Water recovery where land and water are limited | Feed dilution, flocculant, bed depth, drive |
| Paste thickener | Tailings stacking and backfill | Cone, torque, underflow pump |
| Clarifier | Clear water from dilute process streams | Surface area, rise rate, overflow launder |
| Inclined plate settler | Dilute feeds and tight footprints | Plate area and spacing, sludge removal |
Water is the scarcest input at inland Saudi sites, so a thickener that returns clear overflow to the process often pays for itself in avoided supply. Large open settling surfaces lose water to evaporation in summer, and hot inland air and dust load the drive and electrics on the bridge.
Mining use sits under the licensing system and imported equipment passes SASO conformity where regulated. As of 2026, confirm the items below.
| Requirement | Applies to | Authority |
|---|---|---|
| Survey, exploration and mining licence | Mine and processing operation | Ministry of Industry and Mineral Resources |
| Site closure and rehabilitation stage | Tailings and settling ponds at end of life | Ministry of Industry and Mineral Resources |
| Foreign investment licence | Non-Saudi investors | Ministry of Investment (MISA) |
| SABER conformity | Regulated electrical items on the mechanism | SASO |
| Customs duty exemptions reported in 2020 for licensed mining equipment | Imported equipment and spares | Ministry and customs; confirm current terms |
The government investor portal lists the licensing stages including site closure. For import conformity read the guide to SASO and SABER certificates for industrial equipment. Water and wastewater use is separate; see wastewater treatment and water treatment.
Thickeners are built to order by original makers and engineering contractors, with tanks erected on site. One maker lists paste, high-rate and high-compression thickeners and inclined plate settlers for mining. Around them, Huber lists sludge dewatering and compaction screw presses, EDUR lists multiphase pumps for dissolved air flotation, Ruhrpumpen lists slurry and industrial pumps and Tsurumi lists sludge and slurry pumps. For the step after the underflow, see sludge dewatering equipment.
Compare bids on test basis, mechanism torque, drive and gearbox, flocculant system, coatings, automation and spares. Ask where spares are stocked in the Kingdom. Use the guide to sourcing industrial suppliers in the UAE and Saudi Arabia to check authorisation. Where concentration comes first, see gravity separation equipment and magnetic separators.
Check five items before you accept a quotation, because each one is a common source of disputes after delivery:
Also decide early whether one tank must both thicken and clarify. One tank can do both, but it needs a large diameter, tall walls and a strong drive at a substantial cost premium, so it is usually cheaper to split the duty, or to add inclined plates where the feed is very dilute.
A thickener takes the tailings or concentrate from the separation step and feeds either a filter, a tailings line or a water return, so its location on the flowsheet sets pipe and pump sizes. Concentrate thickeners sit after flotation or gravity circuits, tailings thickeners sit at the end of the plant, and leach circuits use thickening before or after the tanks depending on the chemistry. Plan the slurry pumps, the flocculant area and the water return tank at the same time as the thickener, and keep the site layout compatible with erection cranes for the mechanism.
Price follows diameter, depth, torque, material and coatings, flocculant system and automation. Lead time depends on mechanism fabrication, civil works, sea freight to Jeddah, Dammam or Jubail, and inland haulage of large steel parts. Since a single large tank can span many tens of metres, include erection and crane planning in the schedule. Post your requirement with slurry data, settling test results and site location.