Sand control equipment holds back formation sand with screens, gravel packs and flow control devices so that wells can produce without eroding the completion. In Saudi Arabia it matters in unconsolidated sandstones and some gas wells. This page covers screen types, ISO 17824 scope, selection from sand data and sourcing.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified sand control equipment suppliers who quote for your order directly.
Tell us about sand control equipment in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Sand control matters where the reservoir rock is weak or loosely cemented and the flowing pressure pulls grains into the well. Many Saudi reservoirs are carbonate, where this is not a routine problem, so sand control is a targeted purchase for sandstone intervals and some gas wells, a general engineering point to confirm with the reservoir team. Once sand arrives it wears chokes, fills separators and shortens the life of pumps.
The equipment sits in the completion and is part of oil and gas production equipment, closely tied to artificial lift systems. SLB lists gravel packs and sand screens, engineered services for openhole and cased hole applications and sand control pumping equipment, which shows how much of this business is service rather than catalogue goods.
| Item | Role | Specification points |
|---|---|---|
| Wire-wrap screen | Fixed slot opening on a base pipe | Slot size, wire shape, base pipe grade, corrosion resistant alloy |
| Pre-pack screen | Resin or gravel layer inside the screen | Grain size, temperature limit, handling |
| Metal-mesh screen | Woven mesh with large inflow area | Mesh rating, shroud, erosion resistance |
| Gravel pack | Graded gravel around the screen | Gravel size, carrier fluid, placement method |
| Expandable screen | Screen expanded against the open hole | Outside ISO 17824, needs its own specification |
| Flow control devices | Balance inflow along a horizontal screen | Nozzle or channel type, erosion resistance |
ISO 17824 covers wire-wrap, pre-pack and metal-mesh sand control screens, including design, design validation, functional evaluation, manufacturing, storage and transport. The Swedish standards institute lists the European adoption as EN ISO 17824:2014, edition 1, with status valid, though you should check the ISO catalogue for newer work as of 2026.
It leaves out expandable sand screens, slotted liners, accessories such as centralizers, shunt screen technology, inflow control devices, downhole sensors, selective isolation devices, filtration performance criteria and the end connections of the base pipe. Because retention testing is excluded, a screen can be described as compliant without proving how well it holds sand back. Ask for the supplier's retention test data against a sample close to your reservoir sand.
You start with the sand sample and the completion plan. Sieve analysis gives grain size distribution, and the screen opening is chosen to hold back the coarse fraction without plugging on fines. The well type matters too: long horizontal open hole sections often use stand-alone screens with flow control devices to even out inflow, while cased holes in higher risk formations may call for gravel packs or frac packs.
The two failure modes are plugging, which cuts production, and erosion, which lets sand through. A screen that plugged in an offset well tells you more than any catalogue. Gather offset well histories, production logs and any produced sand samples. The cost of failure is high because remedial work means a rig and lost production.
Match the screen to the pump. If an ESP or rod pump will follow, review the options in electric submersible pumps and rod pumping units alongside the screen design. Gas wells may add gas lift equipment later, which also needs the sand issue resolved first.
Screens spend weeks in transit, port yards and rig-site storage before they go downhole, and that exposure is where much damage happens. Write handling and storage requirements into the order: thread protectors, lifting with full-length support, no dragging, covered storage away from blowing sand, and recorded inspection on arrival. ISO 17824 puts storage and transport inside its scope, so ask the supplier which instructions it follows and request them in writing.
Inspect every joint before running. Check the tally, serial numbers and slot size against the design, look for dents or crushed shrouds, and reject damaged joints. Record the as-run tally with depths for later workover planning. A single damaged joint can let sand through an entire interval, and finding that out later costs a rig. These are common completion practices to set out in your own running procedure.
Desert yards add heat and dust. Keep base pipe off hot ground, cap open ends so sand does not enter the base pipe, and clean threads before make-up. Gravel pack jobs add pumping equipment, carrier fluid and gravel logistics, normally arranged by the completions company, so ask what the service includes before comparing prices.
Suppliers are the large completions companies and screen specialists, working under well service or completion contracts. Baker Hughes lists BAKERMESH sand control screens, BAKERWELD wire wrap screens, BAKERWRAP wrap-on-pipe screens, EXCELLPAK multipath gravel-pack screens, EQUALIZER flow control devices and annular packers. Weatherford supplies sand screens and completion tools, and SLB offers screens and gravel pack pumping equipment.
Aramco scores suppliers on local content through iktva, and Baker Hughes opened an assembly plant in Dammam in 2017 that an Aramco procurement executive said met the initiative, though that plant was set up for ESPs. Do not assume the same local content applies to screens: ask each bidder where base pipe is sourced, where screens are made and where they are assembled and tested.
Ask eight questions and compare the written answers. Which standard does the screen follow and what is excluded from it? How was sand retention tested and against what sand? What is the screen's inflow area and plugging tolerance? Which alloy is used and to what sour service standard? What are the end connections and who certifies them? What flow control devices or packers are included? How are handling and storage managed? Where are the screens made and repaired?
Bidders who answer these clearly usually run clean jobs. Those who answer with brochure language leave you to discover the gaps at the rig. Where the bid is for a package rather than a product, ask for the engineering basis and a named completion engineer, so the design reasoning stays with you after the contract is signed.
Price follows screen length, base pipe diameter and alloy, the number of zones, gravel pack services and testing. Sour fields push towards corrosion resistant alloys, which increases cost and lead time. Base pipe, screens and gravel can be imported through Jubail, Dammam or Jeddah, and a screen run also needs rig time. Ask for a dated plan and for handling and storage instructions. To collect offers, post your requirement with the sand analysis, completion type, temperature, H2S level and interval length.