Gas lift equipment uses injected gas, side-pocket mandrels and wireline-retrievable valves to lift oil without a downhole pump. In Saudi Arabia, where associated gas and large producing fields coincide, it is a working alternative to ESPs. This page covers components, standards, gas supply, and how to specify and source.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified gas lift equipment suppliers who quote for your order directly.
Tell us about gas lift equipment in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
A gas lift installation has two halves. Downhole are the side-pocket mandrels, gas lift valves, latches and any tubing-to-casing barrier. On the surface are injection gas lines, flow control at each well, metering and a compressor station. For Saudi buyers it is part of the oil and gas production equipment family and a direct alternative to electric submersible pumps and rod pumping units.
| Part | Role | Buyer checks |
|---|---|---|
| Side-pocket mandrel | Houses a valve beside the tubing bore | API 19G1 design, material for H2S, pressure class |
| Unloading valve | Opens in sequence to unload the well | Calibration record, test rack pressure |
| Operating valve or orifice | Passes the working injection rate at depth | Port or orifice size, back-check, API 19G2 |
| Barrier valve | Blocks tubing to casing flow when a valve is pulled | Integral or separate, V0 qualification |
| Wireline kit | Latches, kick-over tool, running and pulling tools | Match to pocket |
| Surface control | Meters and regulates gas to each well | Flow controller, shutdown, hazardous area rating |
The surface valves on the tree are covered by wellhead valves, and the compression train by gas compressors.
Operators choose gas lift when gas is cheap, compression exists and workover access is costly. Test that logic against your own field economics before committing.
The decisive advantage is intervention. Baker Hughes says its side-pocket mandrels allow valves to be installed and removed by wireline without pulling the mandrel or tubing, and that the pocket accepts gas lift, chemical injection, circulating, dummy, shear orifice and dump kill valves. An ESP failure normally means a rig, apart from rigless designs. For offshore platforms and deviated wells, a wireline valve change can save days.
The cost is the gas system. Gas lift demands compression, dehydration, gas lines and per-well control. A compressor trip reduces injection to every well on the header, so reliability, spare capacity and metering are design requirements, not extras.
A barrier valve gives you a second closed path when a gas lift valve has been pulled, which matters for well integrity. SLB describes a dual-pocket mandrel with inline redundant barriers: a gas lift valve in the primary pocket and an integral tubing-to-casing barrier valve, qualified to API Spec 19G2 V0, that prevents communication between the tubing and casing when the gas lift valve is removed. Both are slickline retrievable.
When you write the specification, say whether a barrier is mandatory and what test level it must carry. Ask bidders to list the barrier as a priced option with its qualification certificate, rather than leaving it to site improvisation.
API Spec 19G1 applies to side-pocket mandrels and API Spec 19G2 to flow-control devices; Aramco and other operators add their own materials and testing requirements, as of 2026. The 19G1 specification covers design, manufacturing, testing and shipping preparation of side-pocket mandrels, with HPHT equipment included above 103.43 MPa or 177 degrees Celsius. It does not cover installation and retrieval, center-set mandrels, tubing-retrievable designs, non-metallic pressure-containing designs, or the valves, latches and wireline equipment.
That list of exclusions is the checklist for your enquiry. If you buy mandrels to 19G1, buy valves to 19G2 separately, and specify the wireline equipment and the calibration test rack as their own items. Sour service material requirements for H2S fields come from the operator specification.
The designer calculates valve spacing and port sizes from the well data, then produces a report that lists each mandrel depth, each valve type, the test rack opening pressure and the expected injection rate. As a buyer, ask for that report to be a deliverable and for the valve calibration records to match it line by line. A valve that was set to the wrong pressure at the rack opens at the wrong point downhole, and the well will not unload.
Continuous gas lift injects at a controlled rate and suits wells with good productivity. Intermittent lift injects in slugs and suits low-rate wells. This distinction is standard engineering practice; ask the designer which applies to each well and why. Check the lift gas to liquid ratio against what the field gas system can deliver at peak demand, because the design is only as good as the gas that arrives at the wellhead.
Hot reservoirs and sour fluids narrow the choice of materials and seals. Valve opening pressure changes with temperature, so the design must correct the rack setting to the well temperature; ask to see the correction. For H2S wells, ask for a materials standard for the mandrel and valve, not just a statement of suitability. At surface, injection lines, flow controllers and local panels sit in direct summer sun, so ask for heat-rated electronics and shading. Dust and sand reach the wellhead area, so seals on control equipment should be inspected as part of routine rounds. These points are engineering practice to write into the specification, not published Saudi rules.
If gas lift is not the right method for a given well, compare it with artificial lift systems as a group before you commit to hardware.
Gas lift mandrels and valves are supplied by the large completions companies. ListGCC lists Baker Hughes for gas lift valves and side-pocket mandrels and Weatherford for gas lift and completion products, and Ariel for the reciprocating compressor frames used in gas lift and injection duty.
Local content counts. An Aramco procurement vice president said at the 2017 opening of the Baker Hughes plant in Dammam that it met the iktva initiative; the plant assembles ESPs and Baker Hughes said it planned to extend to gas lift and other offerings. Check what is currently made in the Kingdom before assuming a bid satisfies local content.
Price follows well count, valves per well, mandrel alloy, pressure rating, barrier valves, calibration and documents. Lead time depends on in-Kingdom stock and the location of valve test and calibration, since valves need setting before shipment and checking on arrival. Special alloys and large orders are built abroad and arrive at Dammam, Jubail or Jeddah ports. Provide the gas lift design, injection pressure, tubing size and H2S content when you post your requirement, and ask each bidder where it will redress valves.