Fire resistant cables in Saudi Arabia keep fire pumps, alarms, smoke control and shutdown circuits working in a fire. This page explains fire resistant, retardant and low smoke cable, BS 7846 and BS 7629-1 categories, Saudi Fire Code, SABER and owner approvals as of 2026, linked cable makers and what drives price and lead time.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified fire resistant cables suppliers who quote for your order directly.
Tell us about fire resistant cables in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
How fire-resistant cable differs from LSZH and flame-retardant cable, which test and survival time suits fire alarm, emergency lighting, fire pump and smoke control circuits, and how to buy it for UAE and Saudi projects.
Fire resistant cables keep a circuit alive for a stated time in a fire; fire retardant cables slow the spread of flame; low smoke cables limit smoke and acid gas. Saudi buyers find all three under the cables and wiring family for Saudi Arabia, and a life safety circuit often needs more than one property.
| Property | Question it answers | Test family |
|---|---|---|
| Fire resistant | Does the circuit keep working in a fire? | BS 6387, BS 8491, BS 8434-2, BS EN 50200, IEC 60331 series |
| Fire retardant | Does the cable carry flame along the route? | IEC 60332-1 and the 60332-3 vertical ladder tests |
| Low smoke halogen free | How dense is the smoke and how corrosive the gas? | IEC 61034 smoke tests |
Related pages: power cables for the feeders, control cables for interlocks, cable trays and ladders for supports and cable glands and lugs for terminations.
Circuits that must keep running in a fire are the usual answer: fire pumps, smoke control fans, fire alarm loops, emergency lighting and voice evacuation, and in process plants the emergency shutdown and fire and gas signals. The Saudi Fire Code (SBC 801) and the General Directorate of Civil Defense set the building requirement, and the plant owner sets it on industrial sites; confirm with the project consultant.
State the required survival time, the standard and category, the voltage and the sheath type, then ask the supplier to show the test report for that exact construction. The label alone does not prove the rating.
Heat matters here too: Saudi summer ambient and roof-space temperatures cut the current a cable can carry, so size the cable for the actual route temperature before relying on its fire rating.
As of 2026 the specification names the test standards, SASO and SABER cover conformity where the product is in scope, and the owner or Civil Defense may require a particular certificate. The route for cable-specific fire certification is set in the project specification, so ask the consultant to state it.
| Requirement | Applies to | Authority or body |
|---|---|---|
| BS 7846, BS 7629-1 | Armoured power and screened alarm cable | BSI; BASEC approval |
| BS 6387, BS 8491, BS 8434-2, BS EN 50200, IEC 60331 series | Circuit integrity tests | BSI, CENELEC, IEC |
| IEC 60332 series, IEC 61034 | Flame spread and smoke emission | IEC |
| Saudi Fire Code (SBC 801) | Where fire resistant circuits are required | Saudi Building Code; Civil Defense |
| SABER conformity | Regulated electrical products in scope | SASO |
| Owner approval | Plant and utility work | The owner's inspection and vendor teams |
The SASO and SABER certificate guide explains how certificates are issued and checked. UAE practice, such as the Emirates Safety Laboratory in Dubai, does not apply in the Kingdom.
Inspect the cable, its supports and its terminations as one system, because the fire rating comes from the tested installation method. A correct cable on the wrong clips does not meet the specification.
Fire resistant constructions add insulation and barrier layers that change how the cable sheds heat, so ask the maker for the current rating of the exact construction in your installation conditions. In Saudi summers, cables in sun-heated roof spaces and risers run warmer than catalogue reference conditions, so a fire pump feeder sized only from a table can be undersized.
Run the sizing calculation with the real route temperature, grouping and length, then confirm that voltage drop at the pump starting current still lets the motor start. Fire pump and smoke extract circuits are not the place to discover a marginal size.
Saudi buyers use Saudi factories and Gulf and international groups. Makers with documented fire resistant ranges are linked here.
Use the sourcing guide to check documents before approving a new supplier.
Price follows copper content, the fire barrier build and certification; lead time follows local stock and import clearance.
When the circuit list is ready, post your requirement and compare like-for-like quotes.
Who makes power cable for UAE and Saudi projects, which IEC and BS standards apply, how 50 °C heat changes cable size, and what MoIAT, Civil Defence, SABER and SEC require.
A UL or Kitemark logo is not UAE approval. Here is how civil defence certificates, Dubai ESL rules and approved maintenance contractors fit together.