Blowout preventers in Saudi Arabia are the annular and ram stacks that seal a well on land and offshore rigs working for Aramco and other operators, including deep gas and sour wells. Buyers are rig contractors and operators who choose between new, rental and recertified stacks. This page covers types, standards, sour service, suppliers and costs.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified blowout preventers suppliers who quote for your order directly.
Tell us about blowout preventers in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Saudi drilling includes shallow oil wells, deep gas wells in the Eastern Province, unconventional gas programmes and offshore wells in the Gulf. A BOP stack is selected for each: the same family of annular and ram preventers, with different bore, pressure rating and sour service trim. The parent page for wellhead equipment in Saudi Arabia shows what sits beneath the stack, and this page looks at the stack itself.
The better question to ask a Saudi buyer is not what a BOP is but how the stack is sourced, since three routes coexist.
| Route | Typical user | What to check |
|---|---|---|
| Buy a new stack | Rig owners adding or upgrading rigs | OEM documentation, API monogram evidence, control system, delivery port |
| Rent a stack | Operators with short programmes or workover rigs | Certification dates, test charts, mobilisation and standby charges |
| Recertify or refurbish an existing stack | Rig contractors on multi-year contracts | Workshop approval, full inspection, replaced elastomers, new test records |
| Buy spares and packing units | Every rig | Exact model, compound for temperature and H2S, batch traceability |
Which route fits depends on the contract term and on how long the rig will stay in the Kingdom.
Cameron, part of SLB, builds ram and annular preventers and is a common name on Saudi rigs. HMH Hydril is the Hydril annular line; the maker lists annulars from 7 to 18 inch bore in pressure ratings of 3K to 15K, with GXP annulars for offshore and the GK 13-5M compact with a radial latch head available on demand. NOV is the third large name for drilling rigs and pressure control equipment.
For consumables, Oteco makes replacement packing units and seals for models such as the Hydril GK and MSP, Regan K and Shaffer spherical preventers, in natural, nitrile and neoprene rubber compounds. It does not build complete BOPs. Valves and chokes that sit with the stack are in wellhead valves, and the tree that follows after drilling is on Christmas trees.
When you compare offers, line up the same facts for each: bore, working pressure, number and type of rams, whether a shear ram is included and what pipe it is rated to cut, the control unit capacity, and whether the elastomers are rated for the mud and the hydrogen sulphide level in the well plan. A cheaper stack that leaves out the shear ram or the remote panel is not a cheaper stack. Ask also who trains the rig crew on the control system, since Saudi operators expect the crew to be certified for well control and the equipment maker is often asked to support that training.
As of 2026, Saudi BOP buying follows operator policy and international standards. Aramco and other operators set test frequency, recertification intervals and crew training rules, and API documents provide the technical base.
| Item | Scope | Comment |
|---|---|---|
| API 16A | Drill-through equipment such as annular and ram BOPs | Named in maker literature for Hydril annulars |
| API Standard 53, fifth edition | Installation and testing of blowout prevention systems on land and marine rigs | Operators decide which edition they use |
| Operator well control policy | Tests, shear capability, drills, certification | Aramco and other operators |
| iktva | In-Kingdom value in Aramco purchases | Aramco reports its initial 70 percent target reached in early 2026, with 75 percent next by 2030 |
| SASO and SABER | Conformity of certain imported goods | May apply to electrical items on the control system |
Drilling Contractor reported a pair of changes in the fifth edition of API Standard 53: BOP requirements based on the maximum anticipated surface pressure of the well rather than the rated working pressure of available equipment, and new language for onshore BOP equipment. Check with your operator whether it follows that edition. For the import side of control panels and instruments, see the SASO and SABER guide.
Deep gas wells and sour reservoirs in the Kingdom bring H2S, so materials and elastomers must suit sour service and the choke manifold trim must match. Land rigs add summer heat, which raises temperatures of hydraulic oil, ram seals and packing elements, and dust, which works into hydraulic connections and ram cavities. Offshore Gulf rigs add salt air on control panels and fittings.
The related tubulars are on casing and tubing, and wider rig equipment is in drilling equipment and services.
Recertification is more than a pressure test. A competent shop strips the stack, inspects bores, ram cavities, bonnets and bolting by non-destructive methods, checks critical dimensions against the maker's limits, replaces all elastomers, rebuilds operating pistons and seals, and then pressure tests the assembly with charts that the operator can audit. Ask for the list of parts replaced, the new test records, and any repairs by weld, which should be done to a qualified procedure. A stack that returns with only a coat of paint and a fresh sticker is a risk to the crew and to the contract.
Between wells, rig crews look after the stack by function testing, greasing, checking hydraulic leaks and storing spare packing elements away from sunlight and heat. Rubber ages in Saudi summers, so a spare element kept in an unshaded container may be unfit when needed. Store elements in a cool, covered place, record manufacture dates, and rotate stock first in, first out.
New stacks come from the OEMs and their Saudi offices. Rental and recertification come from well control service companies with approved workshops in the Kingdom, and some contractors keep in-house shops. Spare elements come from the OEM, authorised distributors and independent makers. Be wary of unmarked or undocumented used equipment, because a stack with no pressure test record is not acceptable to most operators.
To compare offers, post your requirement with stack data and your well programme.