Wind turbines in Saudi Arabia are bought at utility scale for National Renewable Energy Program projects such as Dumat Al Jandal, Al Ghat, Waad Al Shamal and Yanbu, sold by the manufacturer with long service agreements. This page lists Saudi wind turbine suppliers and covers turbine classes for inland and Red Sea sites, the certificates lenders expect, desert climate options, SABER paperwork and the factors behind price and lead time.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified wind turbines suppliers who quote for your order directly.
Tell us about wind turbines in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Saudi Arabia buys utility-scale onshore wind turbines of roughly 4 MW and larger, in orders of dozens or hundreds of units for independent power projects tendered by the Saudi Power Procurement Company (SPPC). They are the main product inside the Saudi wind energy family, which tracks the national programme and project pipeline; this page is about selecting and contracting the turbines themselves.
The first project set the pattern. For Dumat Al Jandal in Al Jouf, the EDF Renewables and Masdar consortium ordered 99 Vestas V150-4.2 MW turbines in July 2019 under an EPC contract with a 20-year Active Output Management service agreement, matching the 20-year power purchase agreement with SPPC. Vestas describes the V150-4.2 MW as a high capacity factor model for low wind sites. In practice that means turbine supply, installation and two decades of maintenance are priced as one package.
| Turbine type | Where it fits in Saudi Arabia | Points to fix in the contract |
|---|---|---|
| Onshore utility turbine with gearbox | Large inland IPPs in Al Jouf, the Northern Borders and the Riyadh region | Gearbox lubrication and cooling for desert summers, oil analysis schedule, spare gearboxes held in the Kingdom |
| Onshore utility turbine, direct drive or medium speed | Sites where simpler drivetrains reduce long-term service visits | Generator and nacelle weight for transport, converter cooling, magnet and generator repair route |
| Small wind turbine | Remote facilities, desert monitoring stations, hybrid systems with solar and storage | IEC 61400-2 design documents, SABER certificates for the electrical kit, dust sealing |
Major parts such as tower sections, blades and gearboxes, often fabricated locally for content credit, are covered under wind tower sections, blades and drivetrain components. Erection crews, blade repair and O&M contractors are under wind farm services in Saudi Arabia.
Match the IEC 61400-1 class to the extreme wind and turbulence measured at the site, then choose the largest rotor that class allows. The class defines the storm the turbine is built to survive; the rotor decides how much energy it takes from ordinary winds.
| Class | Reference wind speed Vref (50-year extreme) | Typical buyer reading |
|---|---|---|
| I | 50.0 m/s | High-wind sites; strongest loads |
| II | 42.5 m/s | Medium-wind sites |
| III | 37.5 m/s | Low-wind sites with long blades |
| S | Designer specified | Values written on the type certificate |
Turbulence is graded separately as category A, B or C. In a lender-financed Saudi IPP, the independent engineer will compare measured site data with the design on six wind climate checks plus terrain complexity: extreme wind, effective turbulence, wind speed distribution, wind shear and flow inclination among them. Ask turbine makers to submit that site compliance analysis with the bid, using the met mast data from the RFP.
For energy yield, check that the warranted power curve will be measured under IEC 61400-12-1:2022 and corrected to the site's air density. Summer air on the plateau around Al Jouf and on the Red Sea coast at Yanbu is less dense than standard air, which lowers output at a given wind speed.
Write heat, dust and, on the coast, salt air into the technical schedule as testable requirements. The Saudi wind energy overview covers field data on heat and dust losses; here the focus is the purchase terms.
Ask for the ambient temperature at which full rated power is guaranteed, the derating curve above it and the hot-climate cooling option for nacelle, converter and pad-mounted transformer. Require nacelle filters that can be cleaned or swapped on a set interval, and make that interval a service KPI.
Coastal humidity and salt add corrosion to the dust problem. Specify the corrosion protection class for tower coatings, flange bolts and electrical cabinets, sealed nacelle cooling where offered, and a coating repair cycle.
Sand erodes leading edges and cuts energy output over time. Ask which leading-edge protection is fitted, the inspection frequency by drone or rope access, and the repair method allowed under warranty.
As of 2026, Saudi wind turbines are judged on the IEC 61400 series, an independent type certificate, the technical schedule and local content terms of each SPPC tender, and SASO conformity through SABER for regulated imported products. Each tender round sets its own details, so read the RFP.
| Requirement | Applies to | Authority or body |
|---|---|---|
| IEC 61400-1:2019 (with Amendment 1 of 2025) | Turbine structural design and wind class | IEC; checked by certification body and lenders' engineer |
| IEC 61400-12-1:2022 | Power curve measurement and verification | Accredited test laboratory |
| IEC 61400-2 | Small wind turbine safety and design | IEC; certification body or test lab |
| Type certificate and site suitability statement | Turbine type and its fit with the site | Independent certification body |
| Tender technical schedule and PPA | Grid code compliance, availability, performance tests | SPPC as buyer; Ministry of Energy oversees the programme |
| Product and shipment certificates | Regulated electrical items imported into the Kingdom | SASO through the SABER platform |
The guide to SASO and SABER certificates for industrial equipment explains product and shipment certificates; confirm with a SASO-approved body which line items in a turbine shipment are covered. Local content minimums are set per tender round and measured with Local Content and Government Procurement Authority (LCGPA) methods, so plan early which towers, cabling and services can be sourced in Saudi Arabia.
Turbines for Saudi IPPs are bought from the manufacturer by the developer consortium or its EPC contractor, and the maker usually keeps the long-term service contract. Vestas supplied Dumat Al Jandal; other makers bid for later rounds through regional offices and local partners.
Brands on ListGCC with wind ranges include GE Vernova, which lists onshore turbines in 3 MW, 4 MW and 6 MW classes and the Haliade-X offshore turbine, and Siemens Energy, whose wind business Siemens Gamesa offers an onshore range of about 2.6 MW to 7 MW across wind classes. Flender supplies gearboxes, couplings and generators used inside wind turbines, which matters for major component exchanges later in the project.
For vetting suppliers, read the guide to sourcing industrial suppliers in Saudi Arabia and the UAE. Developers and EPC teams can post a requirement with project capacity, site coordinates and wind data to reach listed turbine and component suppliers.
Price per megawatt depends on rotor size, the order volume, local content obligations and service scope; lead time depends on factory capacity, blade and tower production, and moving oversized loads across long desert roads. We do not publish prices.