Welding services in Saudi Arabia supply qualified welders and procedures for fabrication, pipework, pressure equipment, repair and shutdown work across the Eastern Province, the Red Sea coast and Riyadh. This page explains service types, the qualification records that owners check, approvals, desert and coastal working conditions and how to compare providers.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified welding services suppliers who quote for your order directly.
Tell us about welding services in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
How welder certification works on UAE and Saudi projects: WPS, PQR and WQTR, which code applies, what the test involves, 1G to 6G positions, how long qualifications last, AWS and CSWIP, and third-party witnessing.
Welding services in Saudi Arabia are contract welding jobs done in a provider's workshop or at the client's site to a drawing, specification or repair order. They sit within metal fabrication services in Saudi Arabia and are bought for pipelines and plant maintenance, tank and vessel work, structural steel, equipment repair and construction support.
| Service | Typical Saudi use | What to confirm |
|---|---|---|
| Shop welding and fabrication | Skids, supports, frames, machine parts | Qualified procedures, welder certificates, inspection plan |
| Site and shutdown welding | Tie-ins, repairs, turnarounds at refineries, power and desalination plants | Owner safety induction, permits, crew size, mobilisation time |
| Pipe welding | Process, utility, water and fire lines in carbon, stainless and alloy | Root pass method, purging, weld maps, NDT extent |
| Orbital and mechanised welding | High purity tube, heat exchanger and pipeline work | Procedure approval for the machine and records; see orbital welding equipment |
| Repair, overlay and hardfacing | Mining, crushing, oilfield and valve parts | Filler type, preheat, post-weld treatment; see thermal spray coating |
| Stainless and aluminium work | Food, pharma, marine and architectural jobs | Contamination control, finish, passivation |
For machines and supplies see welding equipment, welding machine rental, welding consumables and welding PPE and accessories.
A provider should show a welding procedure specification (WPS) supported by a qualification record, and certificates for each welder who will work on your job. TWI describes the WPS as the key document setting out welding variables, supported by a record called the WPAR in BS EN ISO 15614 or the PQR in ASME, and says a change in an essential variable can require a new approval test.
For welders, ASME Section IX, AWS D1.1 and ISO 9606 are the codes most commonly named, as listed by Intertek. Under ISO 9606, TWI says welder certificates are confirmed every six months for up to three years, and then retested or revalidated by one of the permitted routes. In practice an owner such as Aramco reviews WPS, PQR and welder records before work starts, and checks the provider against its own contractor rules; confirm the current procedure with the owner.
As of 2026 the requirements come from the project specification and the owner, rather than from one national welder licence. Saudi building work follows the Saudi Building Code, including its steel structures part; plant and pipeline work follows the owner's engineering standards.
| Requirement | Applies to | Authority or owner |
|---|---|---|
| AWS D1.1 | Structural steel welding | Specification and consultant |
| ASME Section IX, B31.3 and B31.4/B31.8 | Process piping, vessels and pipelines | Owner and project specification |
| ISO 9606 and ISO 15614 | European-style welder and procedure qualification | Specification |
| Aramco, SABIC and utility contractor approval | Plant and pipeline work | The owner |
| Saudi Building Code (SBC 306 for steel) | Buildings and structures | Municipality and Saudi Building Code committee |
| Hot work permits and Civil Defense rules | Welding in live plants and storage areas | Site owner and Civil Defense |
Read SASO and SABER certificates for industrial equipment if the provider imports welding machines or consumables. For witnessed tests see third party inspection, and for piping joint rules see the pipe fittings and flanges standards guide.
Inland sites such as Riyadh are very hot and dusty, while Jubail, Yanbu and Jeddah add humidity and salt. Both change how welding is organised. Protect the arc from wind with screens, keep consumables in ovens or sealed packs, and clean joints of dust before welding.
Pipework in stainless is bought through stainless steel pipes and tubes.
Choose a provider that holds your owner's approvals, has welders qualified to your code and can show inspection records, then compare mobilisation time and price. Large capacity is in the Eastern Province around Jubail and Dammam, with other yards at Yanbu, Jeddah and Riyadh industrial areas.
A clear scope of work avoids disputes after mobilisation. State the base materials, thicknesses, joint types and weld lengths, the code and acceptance level, the NDT percentage and who pays for repairs, and who supplies consumables, gas, power, scaffolding and cranes on site.
Price follows material, thickness, weld length, code and NDT scope, and site conditions. Lead time follows welder availability, approvals and procedure qualification.
Post your requirement with drawings, code, material and location, and use the guide to sourcing industrial suppliers in the UAE and Saudi Arabia to shortlist.