Steel decking in Saudi Arabia is profiled galvanized steel sheet laid on steel beams as permanent formwork for concrete floors, and in composite slabs as the reinforcement on the slab's underside. This page explains the deck types used in Saudi steel-framed buildings, the codes and approvals involved, how coastal humidity and inland heat affect the choice, who supplies decking in the Kingdom, and what drives cost and delivery.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified steel decking suppliers who quote for your order directly.
Tell us about steel decking in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Steel decking carries the wet concrete of a floor so no timber formwork or props are needed over most spans, and in a composite floor it stays in place as the slab's bottom steel. It belongs to the structural steel range for Saudi projects, resting on steel beams and girders that are tied to the slab by shear studs or connectors.
| Profile family | Where it appears in Saudi Arabia | Selection notes |
|---|---|---|
| Trapezoidal composite deck (about 60 to 80 mm) | Office towers and car parks in Riyadh and Jeddah, hospital and education buildings on steel frames | Long unpropped spans and lower concrete volume; studs sit in the troughs |
| Re-entrant composite deck (about 50 mm) | Floors where ducts and ceilings hang from the soffit | Flatter soffit and easy hanger fixing; shorter spans |
| Deep and long-span deck | Slim floor and long-span systems on commercial projects | Usually propped during the pour; needs specialist design |
| Shuttering deck or mezzanine deck | Mezzanines and platforms in warehouses and pre-engineered buildings in industrial cities | Formwork only, with conventional reinforcement in the slab |
Profile names and depths are maker specific. Tata Steel's ComFlor range has seven profiles and Kingspan's Multideck has four (50, 60, 80 and 146), and each comes with its own span, stud and fire tables. For warehouse mezzanines inside a pre-engineered steel building, the deck often arrives in the building maker's package, and the slab reinforcement comes from your rebar and mesh supplier.
In Saudi Arabia, composite floors on steel frames fall under the Saudi Steel Structures Code (SBC 306) and the loads in the Saudi Loading Code (SBC 301), with fire safety under the Saudi Fire Code (SBC 801); the deck itself is designed with the maker's data to the code the engineer adopts, typically Eurocode 4 or the American SDI standard. The table lists what we confirmed as of 2026.
| Requirement | What it covers | Body |
|---|---|---|
| Saudi Steel Structures Code, SBC 306 | Steel members and connections in the floor system, including the beams the deck sits on | Saudi Building Code National Committee; inspection by SASO-accepted bodies |
| Saudi Loading Code, SBC 301, and Saudi Fire Code, SBC 801 | Floor loads; fire safety of the building | Saudi Building Code National Committee |
| EN 1994-1-1 and EN 1994-1-2 | Composite slab design and fire design on Eurocode-based projects | CEN |
| ANSI/SDI SD-2022 | Composite and non-composite floor deck and roof deck on US-based designs | Steel Deck Institute |
| BS EN 10346 coated steel, for example S280GD+Z275 | Sheet grade and galvanized coating mass | CEN |
| SASO Building Materials Part 1 and SABER | Imported steel construction products whose HS codes are in scope | SASO |
Ask the importer whether the HS code of the deck is in scope of the SASO building materials regulation before shipping; our guide to SASO and SABER certificates explains PCoC and SCoC. Many composite slabs reach their fire period from concrete depth alone: Tata Steel states ComFlor slabs need no soffit protection and gives, for trapezoidal deck, 60 mm of concrete cover for 60 minutes.
On the Gulf and Red Sea coasts the risk for steel decking is corrosion of the galvanized soffit where it is exposed to humid, salty air, such as in open car parks; inland, the bigger issues are heat during concreting and dust on the deck before the pour.
For Jeddah, Dammam, Al Khobar, Jubail and Yanbu, check the coating mass on the mill certificate and consider a pre-finished soffit, such as Tata Steel's Colorcoat FD+, or a paint system rated for the exposure where the underside stays visible and ventilated by outside air.
Blow dust and sand off the deck before concreting so the slab bonds to the profile, and plan pours for the cooler hours. Shear studs welded through the deck need clean, dry steel; where site welding is difficult, the Hilti X-HVB connector, which nails to the beam under European Technical Assessment ETA-15/0876, is one engineered alternative the designer can consider.
Keep bundles raised, covered and sloped; trapped moisture causes white rust on galvanized sheet.
Saudi steel decking comes from domestic roll-formers working from galvanized coil, from pre-engineered building makers, and from international deck makers whose products are imported through King Abdulaziz Port in Dammam or Jeddah Islamic Port.
Zamil Steel in Dammam lists steel joists, steel decks and the Hambro D500 composite floor system within its building system. Imported composite decks include Tata Steel ComFlor from the UK and Kingspan Multideck. Hilti supplies powder-actuated shear connectors and deck fasteners used with composite floors.
Ask bidders for profile data, load and span tables, fire tables, coil certificates with grade and zinc mass, SABER status for imports, and whether stud welding and edge trims are in scope. See our supplier sourcing playbook for commercial registration checks.
Saudi deck prices track galvanized coil, so quotes carry short validity; the real comparison is total floor cost, because a deeper or thicker deck that avoids propping can save more than it costs.
Share drawings, slab depth, fire period and exposure with every bidder and post your decking requirement to compare Saudi roll-formers, importers and building system makers.