Membrane bioreactors in Saudi Arabia treat camp, industrial and compound wastewater in a compact biological tank with membrane filtration, producing clear water for reuse. This page lists Saudi suppliers and explains MBR versus conventional plants, projects at Shaybah and Jubail, pretreatment, blower power, approvals, supplier choice and what drives price and lead time.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified membrane bioreactors suppliers who quote for your order directly.
Tell us about membrane bioreactors in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
A membrane bioreactor (MBR) treats wastewater in an aerated biological tank and then pulls the water through membranes, so that the treated stream leaves with almost no suspended solids and no settling tank is needed. In Saudi Arabia that compact, high-quality effluent makes MBRs attractive for oil field and industrial camps, compounds and resorts, giga-project districts and refineries that want reuse-grade water. The process sits inside wastewater treatment, next to sewage treatment plants that use conventional clarifiers.
The technical case in a few words: a higher biomass concentration fits more treatment into a smaller tank, solids retention time can be set independently of flow, and removal of chemical oxygen demand is reported in the range of 96 to 99 percent against about 95 percent for conventional activated sludge. The trade-off is that membranes foul, need regular cleaning, and need air and power.
| Question | Conventional activated sludge | Membrane bioreactor |
|---|---|---|
| Solids separation | Gravity clarifier | Microfiltration or ultrafiltration membrane |
| Land needed | More, for clarifiers | Less, tanks are compact |
| Effluent quality | Depends on settling | Clear, low solids, suited to polishing and reuse |
| Power | Aeration only | Aeration plus scouring air and permeate suction |
| Consumables | Polymer and chemicals | Cleaning chemicals and membrane replacement |
Two projects show the range. At Saudi Aramco's Shaybah oil field in the Empty Quarter, ACWA Emirates replaced a 1997 plant with a 750 cubic metre per day plant handed over in December 2016. WaterWorld reports a train of inlet screens, grit and grease removal, evaporation ponds, anoxic and aeration tanks, and an MBR tank with air blowers and self-cleaning jet filters, with a reported 99 percent water recovery and effluent suitable for irrigation.
At the other end of the scale, Veolia's release of September 2025 for the SATORP petrochemical effluent plant at Jubail names ZeeWeed membranes alongside a moving bed biofilm reactor and Actiflo Carb, within a roughly 500 million dollar project and a 30-year operating contract that begins in 2028, with capacity of about 8.8 million cubic metres a year. Not every large plant uses MBR: the independent sewage treatment plants awarded by the Saudi Water Partnership Company for Madinah, Buraidah and Tabuk use sequencing batch reactors, according to Arab News. The point for buyers is to use an MBR where footprint or effluent quality justifies its energy.
Treated sewage reuse and industrial discharge are controlled through the environmental and water authorities, and the practical source is the permit for the specific plant. The Ministry of Environment, Water and Agriculture runs the unified e-services portal for the environment and water sectors. Ask the permit office which effluent quality class your reuse requires, then write that quality, the sampling points and the test frequency into the MBR tender.
For imported modules and electrical equipment, product conformity requirements may apply; the guide on SASO and SABER certificates for industrial equipment in Saudi Arabia explains how to check. A supplier who is vague about which certificates they hold has not shipped to the Kingdom recently.
Membranes tolerate neither rags nor oil. Fine screens, grit removal and fat removal must come first, and heavy kitchen or workshop loads need traps and flotation. Huber, whose product list includes screens, grit systems, flotation plants and containerised MBR plants, shows how the stages are normally split among product groups. Keep dust out of open tanks with covers; sand wears pumps and blocks screens.
Blowers feed both the biology and the membrane scour, and they dominate running cost. Compare bids on kilowatt-hours per cubic metre of permeate at design temperature, not on nameplate motor size. Specify aeration systems and industrial blowers together so that diffusers, scour grids and blower curves match. Screw and rotary lobe blowers from Kaeser and Atlas Copco are common in this duty.
A remote plant needs remote monitoring, a stock of spare modules and fittings, and operators trained on a cleaning routine. Without those, an MBR can lose capacity within a year even though the design was sound. Include a first-year operation and maintenance period in the contract; the Shaybah contract included six months of operation and training, which is a reasonable minimum.
An MBR is not the answer to every Saudi plant. If land is cheap, effluent goes to a polishing wetland or irrigation with modest quality needs, and operators are few, a conventional or extended aeration plant is simpler and more forgiving. MBRs also react badly to neglected pretreatment, so a site that cannot guarantee screening and grease removal should fix those first. A good supplier will say so, and will price a conventional alternative next to the membrane option so that you can compare cost per cubic metre over the plant's life.
Ask a supplier for the module manufacturer, the plant integrator and the local service team separately, because in Saudi projects these are often three different companies. The guarantee should be held by whoever can fix the problem.
Use the requirement form to invite offers. Huber and Sulzer supply the screens, flotation, mixers and pumps around the membranes.
Price rises with flow, number of trains, membrane area and redundancy, and with the choice of ceramic over polymeric modules. Running costs are mainly power, cleaning chemicals and module replacement, and the cheapest bid is not necessarily the cheapest plant. A remote site adds mobilisation, camp and commissioning costs.
Lead time is set by membrane module production, engineering and approvals, with containerised plants usually faster than concrete tank designs. In large industrial projects, the tank, civil works and permits often set the pace more than the membranes do, so settle the wastewater data and permit conditions early.