Greenhouse climate control in Saudi Arabia covers the exhaust fans, evaporative pads, fog lines, screens, chillers and climate computers that keep vegetables productive in Saudi summer heat. This page explains how to check a cooling design for Riyadh, Qassim or coastal sites, what SASO conformity and Agricultural Development Fund rules mean for buyers as of 2026, how to compare suppliers, and what drives cost and delivery.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified greenhouse climate control suppliers who quote for your order directly.
Tell us about greenhouse climate control in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
In Saudi Arabia, greenhouse climate control means the cooling, airflow, shading and automation that remove summer heat from a covered crop while using as little water and power as possible. It sits inside the broader greenhouse and protected cultivation market in Saudi Arabia. Saudipedia notes that the Agricultural Development Fund finances both air-conditioned and non-air-conditioned greenhouses, and that split is the first decision a Saudi buyer makes.
| System level | Equipment | Where it fits in the Kingdom |
|---|---|---|
| Natural ventilation and shading | Roof and side vents, insect screens, shade screens, circulation fans | Cooler months, nurseries, low-cost crops |
| Evaporative pad and fan | Exhaust fans, cellulose pads, pump, sump, bleed-off | Dry inland regions such as Riyadh, Qassim, Hail and Al Jouf |
| High-pressure fog | Pump unit, stainless or nylon lines, nozzles, water treatment | Even humidity for propagation and sensitive crops |
| Air-conditioned greenhouse | Chillers or direct expansion units, air handlers, ducts, closed or semi-closed cover | Humid coastal sites near Jeddah and Dammam, high-value crops |
| Control layer | Climate computer, aspirated sensors, weather station, alarms | Every system above |
The equipment has to suit the house it goes into. Check pad walls, fan openings and vent areas against the greenhouse frame and covering being supplied in the Kingdom, and consider Saudi shade houses and net houses where shade and airflow alone are enough.
A sound bid sizes exhaust airflow from the floor area first, then matches pad area, pump flow and sump to that airflow. UConn Extension's design basis is 8 cfm for each square foot of floor at 0.1 inch water static pressure, which works out at roughly 146 cubic metres per hour per square metre. It tells designers to increase that figure in unshaded houses where summer light passes 5,000 foot-candles, which Saudi sun easily does, and where fans are less than 100 feet from the pads.
| Item | Extension guide value | What it means for the bid |
|---|---|---|
| 4 inch cellulose pad | 250 cfm per square foot of pad | Air moving through the pad at about 1.3 metres per second |
| 6 inch cellulose pad | 350 cfm per square foot of pad | Less pad wall for the same airflow |
| Pump flow | 0.5 gpm per foot of 4 inch pad, 0.75 gpm for 6 inch | Undersized pumps leave dry streaks that let hot air through |
| Sump | 0.75 gallon per square foot of 4 inch pad, 1 gallon for 6 inch | Enough volume to wet the pad on start-up |
| Make-up water | About 1 gpm per 100 square feet of pad | Sets the farm water budget before bleed-off |
The table is for checking, not designing. The supplier should present the calculation against your site's summer design condition and floor plan.
Evaporative cooling can only bring air down toward the wet bulb temperature. In UConn's example, outside air at 90°F leaves a pad at about 67°F when humidity is 30%, yet only reaches about 82°F at 70%. That is why pad-and-fan performs well in central and northern regions and struggles in humid spells on the Red Sea and Gulf coasts, where Saudi growers more often specify air-conditioned houses.
Each gallon of water evaporated removes about 8,700 Btu, so pad and fog cooling draw heavily on the farm's water. Saline groundwater leaves scale on pads; the extension advice is to bleed off continuously or flush the sump regularly, screen return water at 50 mesh and let fans run for thirty minutes after the pump shuts off to dry the pad. Fog needs treated water, typically reverse osmosis. Plan cooling water with the hydroponic and nutrient systems for Saudi greenhouses so one treatment plant serves both.
The climate computer is what makes the hardware efficient: it brings each device on in order as temperature climbs and records what happened. Each stage only starts if the one before it has not held the setpoint, and as the house cools the stages drop out in reverse. Trade guidance gives an example where shading and fans come before the evaporative pump, which is the order most Saudi summer programmes follow too.
Tinytag data loggers for temperature and humidity give an independent record to compare with the controller, which helps at handover. Fogco 1000 PSI fog pumps and anti-drip nozzles supply misting hardware for fog cooling. Plant factories using horticultural LED grow lights in Saudi Arabia must add the lighting load to the cooling design.
Saudi buyers deal with SASO conformity for imported equipment, the engineering basis written into the contract and, for financed farms, the Agricultural Development Fund. Checked as of 2026; confirm with each authority before tendering.
| Requirement | What it covers | Authority |
|---|---|---|
| Product and shipment certificates (PCoC, SCoC) | Imported fans, pumps, controllers and other regulated items | SASO via the SABER platform |
| Greenhouse project finance | Investment and operating costs of air-conditioned and non-air-conditioned greenhouses | Agricultural Development Fund (ADF) |
| ANSI/ASAE EP406 heating, ventilating and cooling greenhouses | Natural ventilation and fan cooling design, when the contract calls it up | ASABE (EP406.4 of 2003 is the revision we opened; check the current one) |
| Electrical supply and installation | Connection, panels and cabling for fans, pumps and chillers | The electricity utility and a licensed contractor |
The guide to SASO and SABER certificates for imported equipment explains which documents to request before shipment. If the project is ADF-financed, check early which cooling level the fund will support, because it shapes the whole specification.
Cooling and control systems reach Saudi farms through turnkey greenhouse contractors, HVAC firms that build air-conditioned houses, and parts stockists. Compare them on commissioning and service, not only on equipment cost.
Request the design condition, airflow and pad calculation, staging logic, references from operating Saudi greenhouses in a similar climate zone and a spares list held in the Kingdom. The supplier sourcing playbook for Saudi Arabia and the UAE sets out how to compare bids.
Cost rises with the level of control: vents and screens cost least, evaporative pad and fan more, fog adds pumps and water treatment, and air-conditioned houses cost most to build and run.
Pads and nozzles are often stocked in the Kingdom; climate computers, large fans and chillers may be built to order. To get offers, post your requirement with crop, floor area, region and water source.