Green hydrogen production equipment in Saudi Arabia covers electrolysers and their rectifiers, water treatment, purification and compression, powered by solar and wind and often feeding ammonia plants for export. This page lists Saudi suppliers and explains electrolyser types, the NEOM project, how water, heat and variable power shape a plant, the standards and approvals as of 2026, and what drives cost and delivery.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified green hydrogen production suppliers who quote for your order directly.
Tell us about green hydrogen production in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Green hydrogen production equipment in Saudi Arabia means electrolyser plants run on solar and wind power, plus the rectifiers, water treatment, purification and compression that make the hydrogen usable, often converted to ammonia for export. It forms part of the Saudi hydrogen and fuel cells family, which covers the Kingdom's targets; here the focus is on what an electrolyser buyer specifies. Downstream, the gas goes to hydrogen storage, compression and transport or to fuel cell systems for power.
Saudi projects choose between alkaline and PEM electrolysers for most duties, with AEM and solid oxide units at pilot scale. The choice follows plant size, how variable the power supply is, and what the licensor and EPC have delivered before.
| Technology | Electrolyte | Strengths | Questions for the bidder |
|---|---|---|---|
| Alkaline | Liquid potassium hydroxide | Large modular plants, long track record, no platinum in most designs | Minimum load, response to wind and solar swings, caustic handling |
| PEM | Solid polymer membrane | Compact, fast response, high-purity output, pressurised options | Iridium and platinum content, stack life, water purity |
| AEM | Anion exchange membrane | Lower-cost materials with membrane operation | Reference hours at MW scale |
| Solid oxide | Ceramic | Lower power use when process heat or steam is available | Thermal cycling, start-up time, maturity |
The largest Saudi example uses alkaline technology. Air Products awarded thyssenkrupp the contract for an electrolysis plant of more than 2 GW for NEOM, based on its 20 MW alkaline water electrolysis module, CHEManager reported in December 2021. For comparison, Siemens Energy offers PEM electrolysers in atmospheric and pressurised versions.
NEOM Green Hydrogen Company, a joint venture of ACWA Power, Air Products and NEOM, is building a plant at Oxagon to produce up to 600 tonnes of hydrogen a day, exported as up to 1.2 million tonnes of green ammonia a year. NGHC lists about 4 GW of dedicated renewable power, with solar of up to 2.2 GW and wind of 1.6 GW, and reports that commissioning has started with product availability expected in 2027.
For Saudi suppliers this plant matters less as a buyer of new electrolysers, since those were contracted through Air Products, and more as a long-term user of spares, instrumentation, valves, water treatment chemicals, gas detection and maintenance services. Its operating experience will also set the reference that later Saudi projects are judged against.
Water, heat and power profile decide the design on Saudi sites. A plant at Yanbu, Jubail or NEOM faces high summer temperatures, humid salty air and no fresh water, while an inland site faces dust and even hotter afternoons.
Electrolysis consumes about 9 kilograms of water per kilogram of hydrogen by stoichiometry, before treatment losses. On Saudi coasts the source is seawater desalination, polished in demineralisation units to the conductivity the stacks need. Brine disposal and permits belong in the scope.
Solar and wind output rises and falls, so the electrolyser must ramp, idle and restart without damage. Ask for minimum stable load, ramp rate and the effect of frequent cycling on degradation. Some designs add battery storage to smooth the supply from Saudi solar plants and wind farms.
Rectifiers and stacks need cooling, and air coolers lose capacity in 50 degree C weather. Require rated output at the site maximum, sand-rated air filtration for rectifier buildings, and coastal corrosion protection for outdoor skids.
As of 2026 Saudi electrolyser tenders cite ISO and ASME standards through the owner or EPC specification, with SASO conformity for regulated imported products and Civil Defense approval of the installation.
| Standard or approval | Scope | Who applies it |
|---|---|---|
| ISO 22734-1:2025 | Safety of water electrolysis hydrogen generators; replaces ISO 22734:2019 | Owner, EPC, certification body |
| ASME B31.12 | Hydrogen piping and pipelines | EPC piping engineers |
| ISO 14687 | Hydrogen quality for fuel uses | Owner and offtaker |
| Owner engineering standards and vendor approval | Materials, hazardous areas and vendor lists on Aramco, SABIC and Ma'aden sites | Plant owner |
| SASO technical regulations and SABER | Product and shipment certificates for regulated imports | SASO and approved conformity bodies |
| Civil Defense approval | Fire safety and plant layout | General Directorate of Civil Defense |
ISO 22734-1:2025, published in July 2025, deals with safety; the withdrawn 2019 edition also covered performance, so tenders should state separately how energy use and output are to be tested. The SASO and SABER guide explains import certification.
Pick on proven plants in similar climates, guaranteed energy use and degradation, and service presence in the Kingdom, then on price. Electrolysers are bought from manufacturers or their licensed integrators, never from stock.
Also define who supplies rectifiers and power conversion and hydrogen leak detection. For small or steady demand, compare with buying merchant hydrogen gas. The sourcing guide covers agent checks.
Lifetime cost per kilogram is driven by electricity cost and how many hours the plant runs; purchase cost by package scope and guarantees; lead time by factory slots, heavy transport and local content terms.
To compare like-for-like offers, post your green hydrogen requirement with power source, output, pressure, purity and water source.