Combined cycle plants in Saudi Arabia recover gas turbine exhaust heat through heat recovery steam generators and a steam turbine, and they now carry much of the new gas-fired capacity tendered by SPPC and SEC. This page covers how Saudi blocks are configured and phased, how inland heat and dust shape cooling and guarantees, the licensing, conformity and iktva rules as of 2026, the power island suppliers, and what moves cost and schedule.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified combined cycle plants suppliers who quote for your order directly.
Tell us about combined cycle plants in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
A combined cycle plant generates electricity twice from the same fuel: first in gas turbines, then in a steam turbine driven by steam raised from their exhaust in heat recovery steam generators (HRSGs). In Saudi Arabia these plants form the large-scale end of power generation equipment for the Kingdom, and they are procured mainly as independent power projects for the Saudi Power Procurement Company (SPPC) or by Saudi Electricity Company (SEC) and its partners.
Recent Saudi projects show the typical structure. Taiba 1, about 100 km south-east of Madinah, and Qassim 1, near Buraydah, total 3,800 MW; MEED reported in June 2024 that GE Vernova was supplying six 7HA.03 and two 7E.03 gas turbines, Doosan Enerbility two 650 MW steam turbines, and Sepco 3 the EPC work, with completion expected in 2027.
| Project form | How it runs | Saudi example or use |
|---|---|---|
| New-build multi-shaft CCGT | Several gas turbines and HRSGs feed one or more steam turbines | SPPC tendered IPPs with large H-class blocks |
| Phased build (open cycle first) | Gas turbines enter service in simple cycle, the steam cycle follows | POWER Magazine reported Taiba 2 and Qassim 2 were planned to connect in simple cycle in 2026 and switch to combined cycle in 2027 |
| Conversion of an existing open cycle plant | HRSGs and a steam turbine are added behind running turbines | Existing open cycle and peaking stations |
| Industrial combined cycle with steam export | Part of the steam goes to process instead of the condenser | Aramco and industrial city plants, treated as cogeneration |
For the machines themselves, see gas turbines for Saudi power plants and steam turbines for the bottoming cycle. Plants built mainly to supply process steam to Aramco or industrial cities are covered under cogeneration systems in Saudi Arabia.
Saudi heat lowers the output of both cycles at once, dust fouls inlet filters and condensers, and limited fresh water pushes inland plants to dry cooling. The guaranteed figures that matter are those at the plant's own summer design point.
Taiba 1 and Qassim 1, and many other new plants, sit far from the sea. Without seawater, the steam cycle is usually cooled by air, and EPRI reports that steam turbines with air-cooled condensers typically lose 10% to over 20% of generating capacity in the hottest weather. Ask bidders to show net output and heat rate across the full ambient range and to size the condenser for summer, not for an annual average.
Plants in the Eastern Province and on the Red Sea coast can use seawater cooling, which holds condenser pressure lower, but they must handle humidity, warm seawater in summer, intake screening and biofouling. Where cooling towers are used, the high wet bulb temperature on the coast limits their performance.
Dust events load gas turbine filters and coat condenser fins, and growing solar capacity means more daily starts and stops for gas plants. Specify HRSG drains, attemperators and materials for cycling duty, and agree the feedwater and steam chemistry with the supplier of water treatment chemicals.
A Saudi combined cycle plant needs a generation licence or exemption under the Electricity Law, a power purchase agreement with the principal buyer if it sells to the grid, an environmental permit, and conformity certificates for imported and hazardous area equipment. We checked these references in October 2026.
| Requirement | Covers | Authority |
|---|---|---|
| Generation licence or exemption | Electricity generation and cogeneration from any energy source | Electricity regulator under the Electricity Law, Royal Decree No. 262 of 2020 |
| Power purchase agreement | IPP plants selling capacity and energy | SPPC as principal buyer |
| Environmental licence and permits | Plants with air emissions and discharges | National Center for Environmental Compliance (NCEC) |
| ASME PTC 46, with PTC 4.4 and PTC 6.2 | Overall plant, HRSG and steam turbine performance tests | ASME, named in the EPC contract |
| SABER certificates | Imported products under a SASO technical regulation | SASO through SABER |
| SASOEx certificate | Electrical equipment in explosive atmospheres, such as fuel gas areas | SASO |
The Electricity Law says no electricity activity may be carried out without a licence, allows the regulator to grant exemptions for certain activities, and sets a 30 business day period to issue a licence once an application is complete. NCEC, set up by a Council of Ministers decision in March 2019, issues environmental licences and permits and tracks pollution sources. The SASO and SABER certificate guide explains the import side.
Saudi combined cycle plants are delivered by EPC contractors around a power island from a gas turbine manufacturer, with the developer, often a consortium including SEC or ACWA Power, choosing the technology during the bid. GE Vernova supplied the gas turbines for Taiba 1 and Qassim 1 under a 21-year service agreement, and POWER Magazine reported that Siemens Energy HL-class turbines, steam turbines and generators were ordered for Taiba 2 and Qassim 2 with a 25-year maintenance contract. Mitsubishi Power and Ansaldo Energia also compete for Saudi and regional power islands.
Aramco's iktva programme targets 75% of its procurement spend in the Kingdom, and many Saudi buyers weigh local content, so in-Kingdom fabrication, repair shops and service crews carry weight. Use the sourcing guide to check authorisation, and post your requirement for balance of plant packages, spares or services.
Gas turbine class and block size set most of the equipment cost, cooling and site location set much of the rest, and factory slots, licensing and logistics set the schedule. The main drivers: