Bridges and tunnels products in Saudi Arabia are the bearings, expansion joints, bridge formwork systems and tunnel boring machines used on highways, interchanges, metro lines and utility tunnels. This page lists Saudi suppliers of each, explains the Saudi Roads Code issued by the Roads General Authority, what Riyadh Metro shows about tunnelling ground conditions, how desert heat and coastal salt affect moving parts, and what drives cost and lead time.
0 suppliers found · 4 subcategories
Skip the search. Post your requirement and we'll connect you with verified bridges & tunnels suppliers who quote for your order directly.
Tell us about bridges & tunnels in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Saudi bridge and tunnel projects buy four groups of specialist products: bearings that carry decks onto piers, expansion joints that let decks move, formwork systems for building decks and piers, and boring machines for tunnels. They are listed under civil and infrastructure suppliers in Saudi Arabia on ListGCC, and they are almost always engineered for one structure rather than bought from stock.
| Product | Where Saudi projects use it | What to specify |
|---|---|---|
| Bridge bearings (elastomeric, pot, spherical) | Highway interchanges in Riyadh, Jeddah and Dammam, metro and rail viaducts, long desert highway bridges | Loads, rotation, movement, sliding material, design standard, corrosion protection |
| Bridge expansion joints (modular, finger, strip seal, flexible plug) | Deck ends of road and rail bridges, elevated metro guideways, multi-storey car parks | Movement in each axis, traffic class, watertightness, seal replacement, noise |
| Bridge formwork systems (form travellers, movable scaffolding systems, pier forms) | Cast-in-place decks and segmental bridges on highways and rail lines | Span, segment size, deflection limits, design approval, rental terms |
| Tunnel boring equipment (EPB, slurry, multi-mode TBMs, microtunnelling) | Metro tunnels in Riyadh, utility and drainage tunnels, crossings under highways | Diameter, ground and water conditions, cutter wear, segment system, field service |
These products sit inside larger packages. Foundations, piling and ground improvement come from geotechnical and foundation contractors and suppliers. Approaches, pavements and barriers are covered by road construction suppliers in Saudi Arabia, and crossings on the Red Sea and Gulf coasts overlap with marine and coastal works. Precast girders and tunnel segments come from precast concrete producers, and piers and abutments can use standard formwork systems.
Saudi road bridges and tunnels are designed to the Saudi Roads Code launched by the Roads General Authority in May 2024, which covers the design, implementation and maintenance of roads, bridges and tunnels, together with the international product standards named in the project specification. Metro, rail and utility clients add their own specifications. The table reflects sources checked in October 2026; always work to the edition in your contract.
| Requirement | Applies to | Authority or body |
|---|---|---|
| Saudi Roads Code: 25 codes covering planning, design, implementation and maintenance of roads, bridges and tunnels, plus traffic and road safety | Road bridges and tunnels in the Kingdom | Roads General Authority |
| AASHTO LRFD Bridge Design Specifications, 10th edition | Bridge design and the forces passed to bearings and joints, where specified | AASHTO |
| BS EN 1337 series | Structural bearings | CEN / BSI |
| European Technical Assessments for expansion joints (for example EAD 120011-01-0107 for flexible plug joints) | Road bridge expansion joints from European manufacturers | EOTA Technical Assessment Bodies |
| BS EN 16191:2014 | Safety of tunnelling machinery | CEN / BSI |
| SASO technical regulations and SABER certificates, where the product's HS code is regulated | Imported machinery and components | SASO |
The Roads General Authority launched the Saudi Roads Code on 27 May 2024 as a technical reference for all bodies responsible for roads in the Kingdom. It contains 25 codes, including codes for the design, implementation and maintenance of roads, bridges and tunnels, and codes for environmental aspects and autonomous vehicle requirements. For suppliers this means the designer's bearing and joint schedule should reference the code's requirements; ask the designer which parts and which referenced product standards apply before asking for prices.
Bearings are usually specified to BS EN 1337 or to AASHTO, and the supplier must provide calculations and type test reports to match. European joint makers provide European Technical Assessments, each tied to an assessment document for the joint type. Tunnel boring machines are commonly built to BS EN 16191, the European tunnelling machinery safety standard. For imported plant, check the HS code against SASO's regulations; our guide to SASO and SABER certificates explains how Product and Shipment Certificates work.
Riyadh Metro is the clearest guide to the kind of tunnelling Saudi ground demands: mixed ground of limestone and alluvium, bored with both multi-mode and earth pressure balance machines. Herrenknecht reports supplying four multi-mode TBMs of 10,250 mm diameter for about 16.2 km of Line 1 and two EPB shields of 9,730 mm for about 12 km of Line 5, working in 2015 and 2016. More recently the Royal Commission for Riyadh City reported factory acceptance of an EPB machine with an 11.16 m cutterhead for the Red Line extension, which adds 7.1 km of deep tunnel.
For buyers, the lesson is that machine choice follows ground investigation. Heterogeneous ground with hard and soft layers favours machines that can switch modes and cutterheads designed for mixed faces, and abrasive ground means cutter consumption and change-out access must be planned and priced.
Saudi bridges face large daily temperature swings inland, humid salty air on the Red Sea and Gulf coasts, and sand everywhere. Moving parts take the worst of it.
Saudi Arabia buys bridge and tunnel components from specialist manufacturers, mostly overseas, through local agents and regional offices, and rents bridge formwork from formwork companies with Saudi yards. TBMs are bought new from the manufacturer, refurbished or rented, usually with the manufacturer's field crew for assembly, launch and early drive support.
Use the supplier listings below and confirm whether each company manufactures, represents a manufacturer or trades.
See our guide to sourcing industrial suppliers in Saudi Arabia and the UAE for supplier verification steps. When the bearing schedule, joint schedule or tunnel data is ready, post your requirement to get comparable quotes.
In Saudi Arabia, bridge and tunnel products are priced per design: loads, movements, sizes and testing set the cost, and lead time is the sum of design approval, manufacture, shipping and customs clearance. Large projects running at the same time compete for factory slots and formwork fleets.