Bitumen and asphalt in Saudi Arabia are the refinery binder and the hot mix pavement made from it, bought by road contractors, asphalt plants and waterproofing makers. This page covers the binder as a supply item: grades for Gulf heat, how supply is changing, handling and hot storage, the licences and registrations that apply as of 2026, and what moves price.
0 suppliers found
Skip the search. Post your requirement and we'll connect you with verified bitumen & asphalt suppliers who quote for your order directly.
Tell us about bitumen & asphalt in Saudi Arabia and receive competitive quotes from verified suppliers — free, fast, and no obligation.
Saudi bitumen is the heavy residue from crude refining used as the binder in hot mix asphalt, bought by grade and tonne from refiners and their sellers. It belongs to the petroleum products group for Saudi industry. For the finished road materials, emulsions, mixes and laying packages, read the companion page on asphalt and bitumen products for Saudi road projects.
Supply is shifting. Argus reported in 2023 that Saudi Arabia had traditionally been a net bitumen importer, and that Aramco's Luberef was working to start truck to ship loading of bitumen from the Yasref refinery at Yanbu, with an initial target of up to 500,000 tonnes a year of exports. Luberef's own news page later reported a first export cargo of 5,500 tonnes from King Fahad Industrial Port in Yanbu to South Africa, dated April 2024, while an Argaam headline carries an October 2023 date, so the sources disagree on timing. For a buyer the lesson is that export demand and logistics at Yanbu can affect local availability, and it is worth asking sellers how much of a quoted volume is actually tank ready.
| Product | Where Saudi buyers use it | What to specify |
|---|---|---|
| 60/70 and 80/100 penetration grade | Standard hot mix on city and industrial roads | Penetration, softening point, source, batch certificate |
| Performance graded (PG) binder | Hot inland highways, freight corridors | PG grade, traffic level, test regime |
| Polymer modified bitumen (PMB) | Junctions, climbing lanes, bridge decks, airport pavements | Polymer type, elastic recovery, storage stability |
| Emulsions and cutbacks | Tack coat, prime coat, surface treatment | Type, setting rate, residue |
| Oxidised bitumen | Roofing, waterproofing, pipe wrap | Softening point, penetration, product compatibility |
Other parts of the same family include base oils and petroleum coke, which come from the same refineries.
Standard 60/70 penetration bitumen is often too soft for the hottest parts of the Kingdom, and performance graded or modified binders are the usual answer for heavy traffic. The grade still comes from the project specification, and Roads General Authority or municipal documents decide what you can order.
A study by King Fahd University of Petroleum and Minerals used the US Strategic Highway Research Program approach to build a performance based specification for the Gulf. It found that locally produced 60/70 bitumen met requirements in less than 30 percent of the Gulf region, that air blowing would be needed for roughly another 25 percent, and that polymer modification would be needed for the rest, including eastern Saudi Arabia. The paper dates from the 1990s, so refinery output and specifications have moved on, but the climate logic still holds.
Performance grading names a high and a low temperature. A PG 64-22 binder resists rutting where the average seven day maximum pavement temperature is at least 64 and below 70 degrees C, while the second number is the lowest pavement temperature it tolerates. In central and eastern Saudi Arabia surface temperatures in summer run far above air temperature, which is why bumping up one grade for slow, heavy trucks is standard practice on freight roads.
Bitumen must stay hot enough to pump and cool enough not to age. Heated, insulated tanks with temperature control are normal, and long haul deliveries to remote sites need an agreed maximum storage time and temperature.
Many Saudi road jobs are far from a refinery, so tankers may carry binder for hours or days. Ask for the loading temperature on the delivery ticket, test on arrival and keep a retained sample. If a load has cooled and set, reheating it in a tanker is dangerous and should only follow the supplier's procedure.
Wind blown sand enters open hatches, so keep covers closed and clean filters. Sand blocks pumps, heaters and spray bars and shows up later as defects in the mat.
Jubail, Yanbu and Jeddah are humid. Check for water in tanks and pipework before loading, because water in hot bitumen causes foaming and splashing.
As of 2026, activities involving petroleum products in Saudi Arabia, including trading and storage, require licensing from the Ministry of Energy. Product quality is set by the project specification and the tests it calls up, and registered supplier status matters on government and Aramco-linked work.
| Requirement | Applies to | Authority |
|---|---|---|
| Project specification and binder grade table | Grade, tests and limits | Road owner, consultant |
| AASHTO M 320 and related methods | Performance graded binders | Called up by the project |
| Ministry of Energy licence | Trading, storage, transport of petroleum products | Ministry of Energy |
| Batch certificate and plant approval | Each delivery | Supplier, contractor laboratory |
| SASO and SABER rules | Imported packaged goods where a technical regulation applies | SASO |
| Aramco supplier registration | Work for Aramco and affiliates | Aramco |
Aramco states that all suppliers must register and that the process depends on location and supplier type. Importers of packaged goods can use the SASO and SABER certificate guide to plan paperwork.
Choose a seller that can name the refinery of origin and provide a batch certificate with every load. For modified bitumen, ask for plant records that show storage stability and elastic recovery. Small orders in drums are easier through stockists in Riyadh, Jeddah and Dammam.
To collect quotes from several Saudi suppliers, post your requirement with the grade, tonnage and delivery site.
A bitumen order that only says 60/70 leaves too much open. Put the grade and its test method, the quantity in tonnes, the delivery site and window, the loading temperature range and the documents required at delivery on the purchase order. Add who pays for retesting if the contractor laboratory result is outside the limit, and which party owns the product while it sits in the tanker on site.
For modified bitumen, name the polymer and the minimum elastic recovery, and ask how long the product can be stored hot before the polymer separates. Contractors who run their own plants should also confirm that their tank heaters, recirculation pumps and mixing temperatures suit the grade, because a binder that arrives within specification can still be damaged by poor storage on site.
Price follows crude oil, regional refinery output and export demand, with premiums for modification, packaging and small lots. Because Saudi supply has been moving toward exports, ask whether the offered tonnage is committed and from which refinery.
Lead time is shortest for standard grades loaded from a tank near the site and longest for blended PMB or imported specialty grades. Road projects are exposed to distance, since a long haul to a remote corridor adds days and temperature risk. Agree a delivery programme tied to the paving schedule, and leave room for testing before the binder goes into the plant.